Willamette Valley Project Waste Pumping & Chemical Toilet Rental
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Army Corps of Engineers (USACE), Portland District, is soliciting proposals for Waste Pumping and Chemical Toilet Rental Services for the Willamette Valley Project (WVP) in Oregon. This is a Total Small Business Set-Aside under NAICS Code 562991 ($9M size standard). Services include septic tank, chemical toilet, and vault waste pumping and disposal, as well as the rental and servicing of portable toilet units across multiple USACE project sites. Proposals are due February 12, 2026, at 1:00 PM PST.
Scope of Work
The contractor will provide all labor, equipment, and supplies for comprehensive waste management services. This includes:
- Pumping and Disposal: Septic tanks, chemical toilets, and vault toilets, with strict adherence to waste disposal regulations and immediate cleanup of any spillage.
- Portable Unit Rental and Servicing: Provision and maintenance of standard and handicap-accessible chemical toilets and handwashing stations, including restocking supplies and performing repairs.
- Locations: Services are required across various USACE projects within Lane, Marion, and Linn counties, Oregon, including Fern Ridge, Lookout Point, Dexter, Fall Creek, Hills Creek, Dorena, Cottage Grove, Foster, Green Peter, Big Cliff, Cougar, and Detroit.
Contract Details
- Contract Type: Combined Synopsis/Solicitation, Firm Fixed Price (FFP).
- Solicitation Number: W9127N26QA020.
- Period of Performance: A base year from May 1, 2026, to April 30, 2027, with four one-year option periods, extending the potential contract duration through April 30, 2031.
- Key Requirements: Offerors must commit to self-performing a minimum of fifty percent (50%) of the work, in accordance with FAR 52.219-14. A Quality Control Plan (QCP) must be submitted within 10 calendar days of award. Applicable Wage Determinations for Lane, Linn, and Marion Counties, Oregon, are provided.
- Performance Standards: Services must meet PWS specifications, with emergency septic pump alarms requiring a 24-hour response and non-emergency waste removal within three working days.
Submission Requirements & Deadlines
- Solicitation Issue Date: January 13, 2026.
- Offer Due Date: February 12, 2026, 1:00 PM PST.
- Submission Method: Priced proposals must be emailed to both Raymie L. Briddell (raymie.l.briddell@usace.army.mil) and Darrell D. Hutchens (Darrell.D.Hutchens@usace.army.mil). Hard copies will not be accepted.
- Questions Due: February 5, 2026, 12:00 PM PST, submitted via email to the contacts listed above.
Amendment 0001
Amendment 0001, posted January 15, 2026, modified the solicitation by adding septic pumping services for Cottage Grove and Dorena to Option Year 2 (CLINs/SLINs 2028 and 2029). It also corrected quantities and units of measure for several existing CLINs and updated the delivery period for CLIN 0003AA to May 1, 2028 - April 30, 2029. Bidders must review the updated CLIN spreadsheet (Attachment 7 - REV 1) and the revised PWS (Rev1 - 14 JAN 2026) to ensure proposals reflect these changes. The solicitation close date remains unchanged.
Points of Contact
- Primary: Raymie Briddell (raymie.l.briddell@usace.army.mil)
- Secondary: Darrell Hutchens (Darrell.D.Hutchens@usace.army.mil)
- COR: Quenton Chocktoot