Willamette Valley Project Waste Pumping & Chemical Toilet Rental
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Army Corps of Engineers (USACE), Portland District, is soliciting proposals for Waste Pumping & Chemical Toilet Rental Services for the Willamette Valley Project (WVP). This Total Small Business Set-Aside opportunity (NAICS 562991, $9M size standard) seeks a contractor to provide septic tank, chemical toilet, and vault waste pumping and disposal, along with portable toilet rental and servicing. Proposals are due February 12, 2026, at 1:00 PM PST.
Scope of Work
The contractor will provide comprehensive waste management services across various USACE projects within Lane, Marion, and Linn counties, Oregon. This includes:
- Waste Pumping & Disposal: Pumping and lawful disposal of waste from septic tanks, chemical toilets, and 1000-gallon vault toilets (CXT units). Spillage cleanup is required.
- Portable Unit Rental & Servicing: Providing and servicing standard and ADA-compliant handicap chemical toilets and handwashing stations, including cleaning, restocking supplies (toilet paper, soap, etc.), and repairs.
- Locations: Services are required at multiple WVP sites, including Fern Ridge, Lookout Point, Dexter, Fall Creek, Hills Creek, Dorena, Cottage Grove, Foster, Green Peter, Big Cliff, Cougar, and Detroit.
Contract Details & Requirements
- Contract Type: Firm Fixed Price (FFP).
- Period of Performance: A base year from May 1, 2026, to April 30, 2027, with four one-year option periods, extending through April 30, 2031.
- Self-Performance: Offerors must detail a minimum of fifty percent (50%) self-performance in accordance with FAR 52.219-14.
- Contractor Responsibilities: The contractor is responsible for water supply, lawful waste disposal, and providing all labor, equipment, and supplies.
- Quality & Security: A Quality Control Plan (QCP) must be submitted within 10 days of award. Contractor employees must complete AT Level I training and undergo E-Verify screening.
Submission & Deadlines
- Proposal Submission: Priced proposals must be emailed to BOTH Raymie L. Briddell (raymie.l.briddell@usace.army.mil) and Darrell D. Hutchens (Darrell.D.Hutchens@usace.army.mil). No hard copies will be accepted.
- Required Documents: Offerors must complete the "WVP Waste Pumping Combo Doc" and "Attachment 7 - W9127N26QA020 WVP Waste Pumping CLIN spreadsheet_REV1". Unit pricing for all CLINs (base and option years) must be entered in column I of Attachment 7.
- Questions Due: February 5, 2026, by 12:00 PM PST, via email to the contacts.
- Response Due: February 12, 2026, at 1:00 PM PST.
Amendments & Clarifications
Amendment 0001 updated the scope by adding Option Year 2 septic pumping for Cottage Grove and Dorena, and corrected quantities for several CLINs. Recent Q&A clarified that the contractor is responsible for water supply and lawful waste disposal, and the contract will not be split.