Wing Operations Center Furniture
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
Spangdahlem Air Base is issuing a pre-solicitation notice for the procurement and installation of modern, custom-designed furniture for its Wing Operations Center (WOC) in Germany. This requirement is anticipated to be a Firm-Fixed-Price contract. The government is currently seeking industry feedback and clarifications on the draft Statement of Work (SOW) before a formal solicitation is released.
Scope of Work
The contractor will provide all labor, tools, materials, and transportation to deliver and install furniture supporting 15 fully functional workstations. Key requirements include:
- Workstation Design: Custom furniture that maximizes floor space and includes under-desk power solutions with surge protection.
- Technical Integration: Integrated cable management channels and desk-mounted video wall capabilities with modular arms for multiple monitors.
- Ergonomics: Height-adjustable ergonomic seating with lumbar support and durable upholstery.
- Removal Services: Disassembly and removal of existing furniture for government reuse.
- Physical Constraints: Work must accommodate specific room dimensions and interior features (ducts, support beams, and windows) as detailed in the provided layout attachments.
Contract & Timeline
- Type: Firm-Fixed-Price (Anticipated)
- Set-Aside: None (Overseas location)
- Feedback Deadline: February 10, 2026, at 1:00 PM CEST
- Performance Period: Final completion is required no later than March 13, 2026
- Place of Performance: Spangdahlem Air Base, Germany
Evaluation
Future selection is expected to follow a Lowest Price Technically Acceptable (LPTA) process. Evaluation factors will include price and technical acceptability, specifically focusing on specification compliance and the proposed timeline for design, build, and installation.
Additional Notes
This is a pre-solicitation notice only; quotes are not currently being requested. Funds are not yet available for this effort. All personnel will require valid identification for base access and must be escorted by 52 SFS personnel.