Woodcock Creek Lake Bossard Building Roof Replacement
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
The Contractor shall replace the shingle roof, gutters, and downspouts on the Bossard Building. Details of the Bossard Building construction are shown in Attachment 2 ? Reference Drawings and Roof Plan. Representative photos of the Bossard Building and the restroom roof are shown in Attachment 3 ? Reference Photos. The work shall include removal and disposal of all roofing materials over the entire roof, including all flashing, pipe boots, drip edges, shingles and roof felt, and replacement with new roofing underlayment, ice barrier and shingles, new roof ridge cap, new pipe boots, new louvered attic vents, and new flashing around all roof penetrations. Gutters and downspouts on all the eaves shall be removed and replaced with new aluminum seamless gutters with gutter guards and downspouts. The Contractor shall also install a cricket in the valleys between the entrance foyer roof and the adjacent octagonal roofs to create a high point ensuring positive drainage of this area. All material provided in the performance of this Contract shall be new and meet the requirements of the specifications.