Woodcock Creek Lake Bossard Building Roof Replacement

SOL #: W911WN26QA002Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W072 ENDIST PITTSBURGH
PITTSBURGH, PA, 15222-4198, United States

Place of Performance

Place of performance not available

NAICS

Roofing Contractors (238160)

PSC

Construction Of Restoration Of Real Property (Public Or Private) (Y1QA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Oct 3, 2025
2
Last Updated
Oct 16, 2025
3
Submission Deadline
Oct 24, 2025, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

The Contractor shall replace the shingle roof, gutters, and downspouts on the Bossard Building. Details of the Bossard Building construction are shown in Attachment 2 ? Reference Drawings and Roof Plan. Representative photos of the Bossard Building and the restroom roof are shown in Attachment 3 ? Reference Photos. The work shall include removal and disposal of all roofing materials over the entire roof, including all flashing, pipe boots, drip edges, shingles and roof felt, and replacement with new roofing underlayment, ice barrier and shingles, new roof ridge cap, new pipe boots, new louvered attic vents, and new flashing around all roof penetrations. Gutters and downspouts on all the eaves shall be removed and replaced with new aluminum seamless gutters with gutter guards and downspouts. The Contractor shall also install a cricket in the valleys between the entrance foyer roof and the adjacent octagonal roofs to create a high point ensuring positive drainage of this area. All material provided in the performance of this Contract shall be new and meet the requirements of the specifications.

People

Points of Contact

Files

Files

View
View
View
View

Versions

Version 2
Combined Synopsis/Solicitation
Posted: Oct 16, 2025
View
Version 1Viewing
Combined Synopsis/Solicitation
Posted: Oct 3, 2025
Woodcock Creek Lake Bossard Building Roof Replacement | GovScope