WY NP GRTE 13(1), Repair North Park Road at Milepost 15.8

SOL #: 69056726R000006Solicitation

Overview

Buyer

Transportation
Federal Highway Administration
690567 WESTERN FEDERAL LANDS DIV
VANCOUVER, WA, 98661, United States

Place of Performance

Jackson, WY

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

No set aside specified

Timeline

1
Posted
Jan 8, 2026
2
Last Updated
Apr 28, 2026
3
Submission Deadline
May 5, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Highway Administration (FHWA), Western Federal Lands Division, is soliciting proposals for the Repair of North Park Road at Milepost 15.8 within Grand Teton National Park, Wyoming. This is a Task Order Request for Proposal (TORP) issued under the Yellowstone & Grand Teton Multiple Award Task Order Contract (MATOC) IDIQ. Proposals are due May 5, 2026.

Scope of Work

This project involves the repair of a 0.07-mile section of North Park Road. Key tasks include:

  • Asphalt surface repair and deep patching
  • Roadway excavation and geotechnical stabilization
  • Installation of an underdrain system
  • Clearing and grubbing
  • Removal and installation of culverts
  • Implementation of temporary and permanent traffic control measures
  • Pavement markings

The work is governed by Federal Acquisition Regulation (FAR) and the "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24." Contractors will be required to use the "Masterworks" web-based system for daily reports.

Contract Details

  • Contract Type: Firm-fixed-price task order.
  • Estimated Price Range: $700,000 to $2,000,000.
  • Period of Performance: Work to begin within 10 calendar days of Notice to Proceed (NTP), with completion no later than September 23, 2026. NTP is assumed by July 27, 2026.
  • Set-Aside: This opportunity is not set-aside for general competition; it is solely for existing MATOC IDIQ holders (Contractors: H-K CONTRACTORS, INC., M.A. DEATLEY CONSTRUCTION, INC., MISSOURI RIVER CONTRACTORS, LLC, OFTEDAL CONSTRUCTION, INC., RIVERSIDE CONTRACTING INC, SUNDT CONSTRUCTION, INC.). The SAM.gov posting serves to publicize opportunities for potential subcontractors.

Submission & Evaluation

  • Proposal Due Date: May 5, 2026, by 4:00 p.m. local time.
  • Submission Method: Printed copies only; electronic proposals will NOT be accepted.
  • Evaluation: Selection will be based on the lowest price.
  • Questions: Requests for technical information should be submitted via email to wfl.plans-spec@dot.gov. Questions and Answers will be posted on SAM.gov.

Additional Notes

The project site is accessible, with seasonal closures on US 89 between Yellowstone and Grand Tetons, but access is possible via US 26. Further road information is available via NPS and WYDOT links. Large businesses holding an IDIQ contract must submit an acceptable subcontracting plan.

People

Points of Contact

Contracts G. OfficePRIMARY

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 5
Solicitation
Posted: Apr 28, 2026
View
Version 4
Solicitation
Posted: Apr 15, 2026
View
Version 3Viewing
Solicitation
Posted: Apr 7, 2026
Version 2
Solicitation
Posted: Mar 23, 2026
View
Version 1
Pre-Solicitation
Posted: Jan 8, 2026
View