WY NP GRTE 13(1), Repair North Park Road at Milepost 15.8

SOL #: 69056726R000006Solicitation

Overview

Buyer

Transportation
Federal Highway Administration
690567 WESTERN FEDERAL LANDS DIV
VANCOUVER, WA, 98661, United States

Place of Performance

Jackson, WY

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

No set aside specified

Timeline

1
Posted
Jan 8, 2026
2
Last Updated
Apr 28, 2026
3
Submission Deadline
May 5, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Highway Administration (FHWA), Western Federal Lands Division, is soliciting proposals for WY NP GRTE 13(1), Repair North Park Road at Milepost 15.8 within Grand Teton National Park, Wyoming. This is a Firm Fixed-Price Task Order Request for Proposals (TORP), restricted to specific prime contractors holding a Yellowstone/Grand Teton Multiple Award Task Order Contract (MATOC) IDIQ. Proposals are due May 5, 2026.

Project Scope

This project involves the repair of a 0.07-mile section of North Park Road at Milepost 15.8. Key tasks include:

  • Asphalt surface repair and deep patching
  • Roadway excavation
  • Geotextile stabilization and underdrain system installation
  • Clearing and grubbing, culvert removal/installation
  • Temporary and permanent traffic control measures, including pavement markings and sign systems. Work will adhere to the "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24."

Contract Details

  • Contract Type: Firm Fixed-Price Task Order
  • Estimated Value: $700,000 to $2,000,000
  • Period of Performance: Work to begin within 10 calendar days of Notice to Proceed (NTP), with completion no later than September 23, 2026. NTP is assumed by July 27, 2026.
  • Eligibility: Restricted to the six listed prime contractors holding the Yellowstone/Grand Teton MATOC IDIQ. Large businesses must submit an acceptable subcontracting plan.
  • Place of Performance: Grand Teton National Park, Teton County, Wyoming.

Submission & Evaluation

  • Proposal Due Date: May 5, 2026, by 4:00 p.m. local time.
  • Submission Method: Printed copies only; electronic proposals will NOT be accepted.
  • Evaluation: Award will be based on the lowest price.
  • Questions: Technical questions should be submitted via email to wfl.plans-spec@dot.gov. Q&A will be posted on SAM.gov.

Updates & Clarifications

  • Amendment A001 (April 15, 2026): Modifies Subsection 107.10(e) and adds Subsection 107.12 ("Contractor's Camp").
  • Q&A (April 15, 2026): Clarified road access (site accessible via US 26), work hours (to be addressed by A001), portable traffic barriers (subsidiary obligation), traffic control (flaggers may augment signals), and contractor accommodations (NPS reserved 3 sites at Flagg Ranch, to be addressed by A001).

People

Points of Contact

Contracts G. OfficePRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 5
Solicitation
Posted: Apr 28, 2026
View
Version 4Viewing
Solicitation
Posted: Apr 15, 2026
Version 3
Solicitation
Posted: Apr 7, 2026
View
Version 2
Solicitation
Posted: Mar 23, 2026
View
Version 1
Pre-Solicitation
Posted: Jan 8, 2026
View