WY NPS GRTE 2020(1), Moose Wilson Road Phase 2 and WY NP GRTE 11(1), Teton Park Road – Moose to Taggart Lake Trailhead

SOL #: 69056726R000005Solicitation

Overview

Buyer

Transportation
Federal Highway Administration
690567 WESTERN FEDERAL LANDS DIV
VANCOUVER, WA, 98661, United States

Place of Performance

Jackson, WY

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

No set aside specified

Timeline

1
Posted
Nov 12, 2025
2
Last Updated
Feb 3, 2026
3
Submission Deadline
Feb 3, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Highway Administration (FHWA), Western Federal Lands Division, is soliciting proposals for highway construction services for the Moose Wilson Road Phase 2 and Teton Park Road – Moose to Taggart Lake Trailhead projects in Grand Teton National Park, Jackson, WY. This is a Firm Fixed-Price Task Order Request for Proposal (TORP) issued under existing Multiple Award Task Order Contracts (MATOC). Proposals are due February 3, 2026.

Scope of Work

The project encompasses extensive road reconstruction, realignment, and site improvements. The Base Schedule includes:

  • Reconstruction of Moose Wilson Road (from LSRP Visitor Center Entrance to Death Canyon Trailhead Parking Lot).
  • Overlay of Death Canyon Road.
  • Construction of two formal parking areas.
  • Realignment of 0.7 miles of Moose Wilson Road and obliteration of the current alignment.
  • Demolition and removal of three residences (including fencing, outbuildings, and approach roads), with hazardous material surveys completed for Barker-Davis and Wittmer House sites.
  • Installation of Aquatic Organism Passages (AOP) at Upper and Lower Stewart Draw.
  • General construction activities such as earthwork, aggregate, asphalt and minor concrete pavement, culverts, and pavement marking.

Option X involves the reconstruction of the Teton Park Road and Menors Ferry Road intersection, including a new roundabout, lighting, traffic counters, and bike path connection. Environmental compliance is critical, with detailed Stormwater Pollution Prevention Plans (SWPPPs) provided for both Moose Wilson Road Phase 2 and Teton Park Road. Brand name justifications are in place for specific cameras, network equipment, trash receptacles, wood treatment, vault restrooms, and lighting fixtures.

Contract Details

  • Contract Type: Firm Fixed-Price Task Order Contract.
  • Estimated Price Range: $25,000,000 to $35,000,000.
  • Period of Performance: Work to commence within 10 calendar days after Notice to Proceed (assumed March 23, 2026), with completion by November 19, 2027.
  • Eligibility: This solicitation is solely for existing MATOC IDIQ holders. Large businesses must submit an acceptable subcontracting plan.

Submission & Evaluation

  • Proposal Due Date: February 3, 2026, by 1400 local time.
  • Submission Method: Printed copy of the bid must be submitted to the issuing office; electronic bids are not accepted. However, Amendment A001 mandates the use of "Masterworks" for electronic documentation, measurement, payment, and daily records.
  • Evaluation Criteria: Selection will be based on price.
  • Offer Guarantee: Required, 20% of total offer amount for all schedules or $3 million, whichever is less. Offers must provide at least 60 calendar days for Government acceptance.

Key Documents & Amendments

  • Amendment A001 (posted 2026-01-22): Revises specifications (e.g., "Masterworks" requirement for electronic documentation), updates the bid schedule (items A2120, A2140), and revises the Davis-Bacon General Wage Decision. Offerors must submit revised pages A-7 through A-17.
  • Q&A (latest posted 2026-01-29): Clarifies concrete specifications, contractor accommodations, and notes that contingency items, vault toilet work, traffic counter parts, epoxy coated reinforcement, residential housing, and office trailer details will be addressed in Amendment A001 or a future Amendment A002.
  • Detailed engineering plans, quantity tabulations, geotechnical reports, and hazardous material surveys are available in the attachments, crucial for scope and cost estimation.

Contact Information

For questions, contact Contracts G. Office at wfl.contracts@dot.gov or 360-619-7520.

People

Points of Contact

Contracts G. OfficePRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
View
Download
Download
Download

Versions

Version 12
Solicitation
Posted: Feb 3, 2026
View
Version 11
Solicitation
Posted: Feb 2, 2026
View
Version 10
Solicitation
Posted: Jan 30, 2026
View
Version 9
Solicitation
Posted: Jan 30, 2026
View
Version 8Viewing
Solicitation
Posted: Jan 29, 2026
Version 7
Solicitation
Posted: Jan 22, 2026
View
Version 6
Solicitation
Posted: Dec 31, 2025
View
Version 5
Pre-Solicitation
Posted: Nov 26, 2025
View
Version 4
Pre-Solicitation
Posted: Nov 18, 2025
View
Version 3
Pre-Solicitation
Posted: Nov 14, 2025
View
Version 2
Pre-Solicitation
Posted: Nov 12, 2025
View
Version 1
Pre-Solicitation
Posted: Nov 12, 2025
View
WY NPS GRTE 2020(1), Moose Wilson Road Phase 2 and WY NP GRTE 11(1), Teton Park Road – Moose to Taggart Lake Trailhead | GovScope