Y--Meadowood Sensory Nature Trail

SOL #: 140L0626R0004Solicitation

Overview

Buyer

Interior
Bureau Of Land Management
NATIONAL OPERATIONS CENTER
DENVER, CO, 80225, United States

Place of Performance

Lorton, VA

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Construction Of Recreation Facilities (Non Building) (Y1PA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 25, 2026
2
Last Updated
Apr 21, 2026
3
Submission Deadline
May 4, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Bureau of Land Management (BLM), under the Department of the Interior, is soliciting proposals for a Design-Build project to construct the Meadowood Sensory Nature Trail and associated improvements at the Meadowood Special Recreation Management Area (SRMA) in Lorton, VA. This opportunity is a Total Small Business Set-Aside. Proposals are due May 4, 2026, at 12:00 PM MDT.

Scope of Work

This project encompasses three main components:

  • Meadowood Sensory Nature Trail: Design and construction of an approximately 1-mile fully accessible sensory nature trail, featuring up to six activity stations (e.g., Classroom, Build/Design, Senses, Play/Active, Reflection, Music). The trail is specifically designed for individuals with neurodivergent conditions, utilizing natural materials and minimizing ambient noise. A medical or clinical specialist with expertise in neurodiversity and sensory processing must be included on the design team.
  • Enchanted Pond Outflow Culvert Replacement: Excavation and replacement of a failing 12-inch corrugated metal outflow culvert, including backfilling, pond embankment repair, and outlet stabilization. The Design-Build Contractor (DBC) is responsible for dewatering design and construction.
  • Mustang Trailhead Improvements: Enhancements to the existing 8.20-acre Mustang Trailhead parking area. This includes expanding parking to accommodate 12 horse trailers, 25 POVs, and 4 semi-trailers, installing public toilets, water/electrical utilities, creating an access road from Gunston Road, and a new trail entrance structure. Parking lots will be compacted gravel with concrete sidewalks.

Contract Details

  • Contract Type: Firm Fixed-Price (FFP), Single Award.
  • Period of Performance: Not to exceed 450 calendar days from the Notice to Proceed. Construction is anticipated to begin before October 1, 2026.
  • NAICS Code: 237990 (Other Heavy and Civil Engineering Construction) with a Small Business Size Standard of $45M.
  • Product Service Code: Y1PA (Construction of Recreation Facilities (Non Building)).
  • Set-Aside: Total Small Business. While no subcontracting plan is required, FAR 52.219-14 Limitations on Subcontracting applies, requiring the prime contractor to perform at least 15% of the contract cost with its own employees or similarly situated subcontractors.

Submission & Evaluation

Proposals must be submitted electronically in PDF format by the deadline. Evaluation will follow a Best Value Continuum Tradeoff Approach, considering factors such as Technical Approach, Schedule, Design-Build Team/Key Personnel, Past Performance, and Price. Non-price factors, when combined, are of approximate equal importance to price. Offerors are urged to submit their most favorable terms as the government intends to award without negotiations.

Key Dates & Contacts

  • Proposal Due Date: May 4, 2026, at 12:00 PM MDT.
  • Point of Contact: Kassandra Hicks, Contract Specialist (khicks@blm.gov).

People

Points of Contact

Hicks, KassandraPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Solicitation
Posted: Apr 21, 2026
Version 3
Solicitation
Posted: Apr 9, 2026
View
Version 2
Solicitation
Posted: Mar 18, 2026
View
Version 1
Pre-Solicitation
Posted: Feb 25, 2026
View
Y--Meadowood Sensory Nature Trail | GovScope