Y--NGWSP BLOCK 2-3 HDD
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Interior, Bureau of Reclamation is soliciting proposals for the Navajo-Gallup Water Supply Project (NGWSP) Block 2-3 Horizontal Directional Drilling (HDD). This project involves the construction of critical water transmission pipelines in San Juan County, New Mexico. Proposals are due February 25, 2026, at 1:00 PM MT.
Scope of Work
This solicitation covers the installation of approximately 1.8 miles of buried water transmission pipelines using Horizontal Directional Drilling (HDD) across four key locations:
- Nenahnezad Bluff: 42-inch pipeline, approximately 3,295-foot bore length.
- Shumway Arroyo: 36-inch pipeline, approximately 2,000-foot bore length.
- San Juan River: 36-inch pipeline, approximately 2,400-foot bore length.
- Chaco River: 36-inch pipeline, approximately 2,080-foot bore length. The scope includes associated work such as pilot bores, conductor casing, access roads, and water for dust abatement. Bidders must provide full-time safety, quality control, and qualified survey personnel. Work at Shumway Arroyo HDD is restricted to November 1 through February 28.
Contract & Timeline
- Contract Type: Firm-Fixed Price (FFP)
- Estimated Magnitude: Between $30,000,000 and $60,000,000
- Period of Performance: May 20, 2026, to September 21, 2027 (approximately 469 calendar days)
- Liquidated Damages: $11,525.00 per calendar day for delays
- Proposal Due: February 25, 2026, at 1:00 PM MT
- Published Date: January 16, 2026 (latest amendment)
Set-Aside & Preferences
While no specific set-aside type is designated, the solicitation includes Indian Preference requirements for employment and subcontracting, and requires Small Business representations and certifications.
Evaluation Factors
Proposals will be evaluated based on: Technical Approach; Staff Qualifications & Key Personnel & Experience; Quality Control; Past Performance & Safety; and Cost/Price. Technical factors (the first three) are considered approximately equal and more important than Cost/Price.
Key Details & Amendments
Multiple amendments have provided significant clarifications and updates:
- Amendment 0003 (Jan 16, 2026) included remaining Q&A, updated specifications (Section B, Coatings, HDD), and revised drawings for Nenahnezad Bluff.
- Questions & Answers Round 2 (Jan 16, 2026) clarified technical details such as HDD reaming sizes (max 12 inches, 6 inches for Nenahnezad Bluff), pipe material specifications (36" DR21 FPVC not acceptable for San Juan River), drilling fluid disposal, coating contractor accreditation, and bore profile modifications.
- Amendment 0002 (Dec 10, 2025) provided responses to questions and updated specifications on Use of Site, Work Restrictions, Submittals, Temporary Safety Fence, Protected Species, and Gravel Surfacing.
- Amendment 0001 (Dec 5, 2025) corrected the period of performance and provided site visit materials. Bidders must acknowledge all amendments and ensure their proposals reflect the latest requirements. Detailed geological logs, engineering drawings, price schedules, experience forms, key personnel forms, and past performance questionnaires are critical attachments. Prevailing wage rates for San Juan County, NM, are applicable.