NGWSP BLOCK 2-3 HDD

SOL #: 140R4026R0002Solicitation

Overview

Buyer

Interior
Bureau Of Reclamation
UPPER COLORADO REGIONAL OFFICE
SALT LAKE CITY, UT, 84138, United States

Place of Performance

Place of performance not available

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Construction Of Water Supply Facilities (Y1NE)

Set Aside

No set aside specified

Timeline

1
Posted
Oct 6, 2025
2
Last Updated
Jun 9, 2026
3
Submission Deadline
Feb 25, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Interior, Bureau of Reclamation has issued a solicitation for the Navajo-Gallup Water Supply Project (NGWSP) Block 2-3 Horizontal Directional Drilling (HDD). This project involves the installation of significant lengths of buried water transmission pipelines using HDD technology. The estimated magnitude is between $30,000,000 and $60,000,000. Proposals are due February 25, 2026, at 1:00 PM MT.

Project Overview & Scope

This solicitation (No. 140R4026R0002) requires the installation of buried water transmission pipelines via Horizontal Directional Drilling (HDD) across multiple locations. Key requirements include:

  • 42-inch pipeline HDD: Approximately 3,295 feet for Reach 2 at Nenahnezad Bluff.
  • 36-inch pipeline HDD:
    • Approximately 2,000 feet for Reach 2 at Shumway Arroyo.
    • Approximately 2,400 feet for Reach 2 at San Juan River.
    • Approximately 2,080 feet for Reach 3 at Chaco River.
  • Associated work includes pilot bores, conductor casing, access roads, and water for dust abatement. The CLIN covers all items and personnel for turnkey pipe installation.
  • The work is located along the Block 2-3 pipeline alignment, south of Frank Chee Willetto Reservoir, New Mexico, extending to the San Juan Lateral Water Treatment Plant in San Juan County.

Contract Details

  • Contract Type: Firm Fixed-Price (FFP).
  • Estimated Magnitude: $30,000,000 to $60,000,000.
  • Period of Performance: May 20, 2026, to September 21, 2027 (approximately 469 calendar days).
  • Liquidated Damages: $11,525.00 per calendar day of delay.
  • Taxes: New Mexico Gross Receipts Tax and Navajo Nation Tax are reimbursable but must be included in the price proposal.

Submission & Evaluation

  • Proposal Submission Deadline: February 25, 2026, at 1:00 PM MT.
  • Submission Method: Electronic submission via Microsoft Teams or Kiteworks.
  • Proposal Validity: Offers must be valid for at least 60 calendar days.
  • Evaluation Factors: Technical Approach, Staff Qualifications & Key Personnel & Experience; Quality Control; Past Performance & Safety; and Cost/Price. Technical factors (1-3) are considered approximately equal and more important than Cost/Price.
  • Required Forms: Bidders must complete an "Experience Worksheet," "Key Personnel Form," and facilitate a "Past Performance Questionnaire."

Key Amendments & Clarifications

Multiple amendments have been issued, providing significant updates:

  • Amendment 0005 (Latest): Updates SPEC 33 05 22 Horizontal Directional Drilling (HDD) and WBR 1452.215-81 Proposal Instructions. Reaffirms the period of performance.
  • Amendment 0003: Included vendor Q&A, updated specifications (Section B, Coatings, HDD), and revised drawings for Nenahnezad Bluff.
  • Amendment 0002: Provided responses to questions and updated several specification sections (Use of Site, Work Restrictions, Submittals, Safety Fence, Pesticides, Protected Species, Gravel Surfacing) and a drawing.
  • Q&A Rounds: Clarifications on HDD reaming sizes, pipe materials, disposal of drilling fluids, coating contractor accreditation, bore profiles, and geotechnical information have been provided. Seasonal restrictions for Shumway Arroyo HDD (Nov 1 - Feb 28) were noted.

Additional Notes

  • Set-Aside: No formal set-aside is specified, but the solicitation includes Indian Preference requirements for employment and subcontracting (detailed in Section H).
  • Site Visit: A pre-bid conference and site tour were held on December 2, 2025.
  • Key Concerns: Potential challenges include elevation differences, inadvertent fluid return, bore instability, and cultural resource compliance.
  • Contact: Amy Loveless (aloveless@usbr.gov, 8015243790).

People

Points of Contact

Loveless, AmyPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 9
Award Notice
Posted: Jun 9, 2026
View
Version 8
Solicitation
Posted: Feb 3, 2026
View
Version 7
Solicitation
Posted: Jan 29, 2026
View
Version 6
Solicitation
Posted: Jan 16, 2026
View
Version 5
Solicitation
Posted: Dec 10, 2025
View
Version 4
Solicitation
Posted: Dec 5, 2025
View
Version 3Viewing
Solicitation
Posted: Nov 17, 2025
Version 2
Pre-Solicitation
Posted: Oct 31, 2025
View
Version 1
Pre-Solicitation
Posted: Oct 6, 2025
View
Y--NGWSP BLOCK 2-3 HDD | GovScope