Y--NGWSP BLOCK 2-3 PIPELINE

SOL #: 140R4026B0001Pre-Solicitation

Overview

Buyer

Interior
Bureau Of Reclamation
UPPER COLORADO REGIONAL OFFICE
SALT LAKE CITY, UT, 84138, United States

Place of Performance

Place of performance not available

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Construction Of Water Supply Facilities (Y1NE)

Set Aside

No set aside specified

Timeline

1
Posted
Dec 18, 2025
2
Last Updated
Mar 13, 2026
3
Response Deadline
Jun 24, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Bureau of Reclamation, Upper Colorado Regional Office, has issued a presolicitation notice for the Navajo-Gallup Water Supply Project (NGWSP) Block 2-3 Pipeline. This is a Full and Open Competition for a construction project estimated between $100,000,000 and $150,000,000. The official solicitation is anticipated to be released around April 10, 2026, with an overall response date of June 24, 2026.

Purpose

This opportunity is for the construction of a critical segment of the Navajo-Gallup Water Supply Project, aimed at conveying water from the San Juan River to support regional water supply needs.

Scope of Work

The project involves extensive construction, including:

  • Approximately 6.0 miles of 42-inch diameter buried water transmission pipe.
  • Approximately 5.9 miles of 48-inch diameter buried water transmission pipe.
  • Construction of two 0.3 million-gallon ground level storage tanks with associated yard and access road.
  • Installation of various crossings, including wash, bored, road, and utility crossings.
  • Integration of precast manhole structures, concrete thrust collars, tapers, and encased miter bends.
  • Installation of buried manholes, valves, air valves, and blowoffs.
  • Implementation of erosion control and cathodic protection systems.
  • Integration of Supervisory Control and Data Acquisition (SCADA) equipment and fiber optic cabling.

Detailed draft specifications, engineering drawings, and geotechnical logs are available, providing comprehensive information on pipeline layout, construction methods, structural data, electrical systems, and subsurface conditions.

Location of Work

The pipeline alignment begins south of the Frank Chee Willetto Reservoir (approximately 17 miles east of Shiprock, NM) and terminates at the San Juan Lateral Water Treatment Plant (approximately 6 miles east of the intersection of U.S. Highway 491 and Navajo Route 36) in San Juan County, New Mexico.

Contract Details

  • Type: Competitive solicitation under FAR Part 14 (Sealed Bidding).
  • Estimated Value: $100,000,000 to $150,000,000.
  • NAICS Code: 237110 (Water and Sewer Line and Related Structures Construction), with a small business size standard of $45.0 million.
  • Set-Aside: Full and Open Competition.

Timeline & Submission

  • Solicitation Release: On or around April 10, 2026, on SAM.gov.
  • Overall Response Date: June 24, 2026, 4:00 PM UTC.
  • Pre-award Site Visit: Planned around April 22, 2026.
  • Draft Documents: Draft specifications and drawings are available for comment. Questions regarding the draft must be submitted in writing via email no later than one week after the draft's posting.

Additional Notes

This notice is for planning purposes only and is not a Request for Proposal (RFP), Invitation for Bid (IFB), or Request for Quotation (RFQ). No award will be made as a result of this notice. Interested vendors are encouraged to register in the System for Award Management (SAM).

People

Points of Contact

Spencer, TylerPRIMARY

Files

Files

Download
Download
Download
Download

Versions

Version 3
Pre-Solicitation
Posted: Mar 13, 2026
View
Version 2Viewing
Pre-Solicitation
Posted: Mar 10, 2026
Version 1
Sources Sought
Posted: Dec 18, 2025
View
Y--NGWSP BLOCK 2-3 PIPELINE | GovScope