Y--NGWSP BLOCK 2-3 PIPELINE

SOL #: 140R4026B0001Solicitation

Overview

Buyer

Interior
Bureau Of Reclamation
UPPER COLORADO REGIONAL OFFICE
SALT LAKE CITY, UT, 84138, United States

Place of Performance

Place of performance not available

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Construction Of Water Supply Facilities (Y1NE)

Set Aside

No set aside specified

Timeline

1
Posted
Dec 18, 2025
2
Last Updated
Jun 11, 2026
3
Submission Deadline
Jun 30, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Interior, Bureau of Reclamation is soliciting bids for the Navajo-Gallup Water Supply Project (NGWSP) Block 2-3 Pipeline construction. This Fixed Price Contract with Economic Price Adjustment is estimated between $100 million and $150 million. Offers are due June 30, 2026, at 10:00 AM MT.

Scope of Work

This project involves the construction of approximately 11.9 miles of buried water transmission pipe (6.0 miles of 42-inch and 5.9 miles of 48-inch diameter) for the San Juan Lateral – Block 2-3. Key deliverables include:

  • Construction of two 0.3 million-gallon ground level storage tanks, associated yard, and access roads.
  • Installation of wash crossings, bored crossings, road crossings, and utility crossings.
  • Integration of precast manhole structures, concrete thrust collars, tapers, encased miter bends, buried manholes, valves, air valves, and blowoffs.
  • Implementation of erosion control and cathodic protection systems.
  • Provision of Supervisory Control and Data Acquisition (SCADA) equipment and fiber optic cabling.
  • Connection of the Block 2-3 pipeline to Pumping Plant One (1) and the Block 2-3 Horizontal Direction Drill (HDD) Pipeline.
  • Comprehensive Quality Control/Quality Assurance (QC/QA) program, detailed submittals (including As-Built Drawings), and environmental/cultural resources compliance.

Contract Details

  • Contract Type: Fixed Price with Economic Price Adjustment for Fuel (Gas & Diesel) and Steel.
  • Estimated Value: $100,000,000 - $150,000,000.
  • Period of Performance: 21 calendar days to begin performance after award, with completion within 675 calendar days. The pipeline must be completed no later than September 15, 2028.
  • Set-Aside: This is a Full and Open Competition. Indian preference requirements are applicable. Minimum subcontracting goals are established: Small Businesses - 45.87%, Small Disadvantage Businesses – 5%, Woman-owned Small Businesses - 5%, HubZone Small Businesses - 3%, Service-Disabled Veteran-owned Small Business - 5%.
  • NAICS Code: 237110 Water and Sewer Line and Related Structures Construction ($45.0 million size standard).

Submission & Evaluation

Offers are due by June 30, 2026, at 10:00 AM MT. Sealed offers must be submitted in original and one copy, clearly marked with the offeror's name, address, solicitation number, and due date/time. Offers providing less than 60 calendar days for Government acceptance will be rejected. Award will be made to the responsible offeror that is compliant with the solicitation terms, presents proof of an appropriate bid guarantee, and submits the lowest priced bid. Pricing will be evaluated for balance, fairness, and reasonableness.

Important Notes

Bidders must adhere to Buy American requirements and prevailing wage rates (Davis-Bacon Act). New Mexico Gross Receipts Tax and Navajo Nation Tax will be reimbursed. Performance and Payment Bonds are required. A site visit was held on April 22, 2026, and questions were due by May 13, 2026. Geotechnical reports and detailed drawings are available and critical for understanding site conditions and design specifications.

People

Points of Contact

Spencer, TylerPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 8
Solicitation
Posted: Jun 11, 2026
View
Version 7Viewing
Solicitation
Posted: Jun 9, 2026
Version 6
Solicitation
Posted: Jun 1, 2026
View
Version 5
Solicitation
Posted: Apr 27, 2026
View
Version 4
Solicitation
Posted: Apr 15, 2026
View
Version 3
Pre-Solicitation
Posted: Mar 13, 2026
View
Version 2
Pre-Solicitation
Posted: Mar 10, 2026
View
Version 1
Sources Sought
Posted: Dec 18, 2025
View