Y--Steamboat Rock State Park Shoreline Stabilization Columbia Basin Project, Washi

SOL #: 140R1026B0001Pre-Solicitation

Overview

Buyer

Interior
Bureau Of Reclamation
PACIFIC NW REGION PN 6615
BOISE, ID, 83706, United States

Place of Performance

Electric City, WA

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Construction Of Other Non Building Facilities (Y1PZ)

Set Aside

No set aside specified

Timeline

1
Posted
Feb 9, 2026
2
Last Updated
Jun 8, 2026
3
Response Deadline
Jun 5, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Bureau of Reclamation (BUREAU OF RECLAMATION), under the Department of the Interior, is preparing to issue a Firm-Fixed-Price construction solicitation for shoreline stabilization at Steamboat Rock State Park, Electric City, WA. This project aims to protect existing bank slopes from further erosion. This procurement is a Total Indian Small Business Enterprise (ISBEE) set-aside. The solicitation is expected to be issued no sooner than 15 days from May 20, 2026, with proposals due no sooner than 30 days after issuance.

Scope of Work

The primary objective is to stabilize the northern shoreline of Steamboat Rock State Park. Key requirements include:

  • Stabilizing the shoreline using void-filled riprap and large stones.
  • Supplementing riprap with topsoil backfill and revegetation below elevation 1572.00 feet.
  • Protecting existing bank slopes from erosion and degradation.
  • Completing all work without construction or use of temporary roads within the Banks Lake drawdown zone, and without performing work from land inside the drawdown zone.
  • Preparing and submitting a Pre-Work Access Plan for approval before construction begins.

Contract Details

  • Contract Type: Firm-Fixed-Price (FFP) construction.
  • Estimated Magnitude: Between $1,000,000 and $5,000,000.
  • Period of Performance: August 14, 2026, through August 14, 2027.
  • Onsite Construction Window: Mandatory from October 1, 2026, to May 1, 2027, due to environmental and reservoir-management restrictions.
  • Product Service Code: Y1PZ (Construction Of Other Non Building Facilities).
  • NAICS Code: 237990 (Other Heavy and Civil Engineering Construction) with a Small Business Size Standard of $45 million.

Eligibility & Set-Aside

This procurement is competed as a Total Indian Small Business Enterprise (ISBEE) set-aside. Bids will be accepted from all responsive and responsible small business concerns that meet this set-aside requirement.

Submission & Evaluation

The solicitation will be issued electronically on SAM.gov no sooner than 15 days from the notice date (May 20, 2026) and will close no sooner than 30 days after its issuance. Any amendments will also be posted on SAM.gov.

Additional Notes

Entities must be registered in SAM.gov to do business with the Bureau of Reclamation (BOR) and the Department of the Interior (DOI). Primary points of contact are Brock Palen (USBR Contract Specialist) and Michael Naseath (Contracting Officer).

People

Points of Contact

Naseath, MichaelPRIMARY

Files

Files

Download

Versions

Version 3
Solicitation
Posted: Jun 8, 2026
View
Version 2Viewing
Pre-Solicitation
Posted: May 20, 2026
Version 1
Sources Sought
Posted: Feb 9, 2026
View
Steamboat Rock State Park Shoreline Stabilization | GovScope