Y--SYNAR AML Reclamation Construction
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Interior, Office of Surface Mining, Reclamation and Enforcement (OSMRE) has issued a Solicitation for the SYNAR AML Reclamation Construction project in Rogers County, Oklahoma. This effort aims to reclaim an abandoned coal mine site, critical for public health, safety, and property protection. This is a 100% Total Small Business Set-Aside. Bids are due by April 27, 2026, at 2:00 PM Eastern Time.
Scope of Work
The project requires construction services for the reclamation of hazardous abandoned coal mine sites. Key deliverables include:
- Grading and shaping approximately 89 acres of spoils to conform to adjacent topography.
- Maintaining current stormwater flow and controlling erosion/sedimentation.
- Eliminating a dangerous highwall and a hazardous water body.
- Establishing permanent vegetative cover.
- Specific tasks: Mobilization, Clearing and Grubbing (approx. 63 acres), Air Curtain Incinerator, Earth Fill (approx. 351,777 cubic yards), Fencing (5-wire and temporary 3-wire), Traffic Bound Surface Course, Temporary Erosion and Sediment Control (Straw Wattles, Rock Check Dams), Rip Rap Type IA (12"), Deep Disking (approx. 72 acres), and Permanent Erosion Control (lime, fertilizer, seeding).
Contract Details
- Contract Type: Fixed-Price Construction Contract.
- Period of Performance: 349 calendar days, anticipated from May 4, 2026, to May 3, 2027. The performance period is mandatory and not negotiable.
- Project Magnitude: Estimated between $1 million and $5 million.
- Set-Aside: 100% Total Small Business Set-Aside.
- NAICS Code: 562910 (Remediation Services), with a small business size standard of $39.5 million.
- Product Service Code: Y1KE (Construction Of Surface Mine Reclamation Facilities).
- Bonds: A bid bond of 20% of the total bid price is required. Performance and Payment Bonds (100% of contract price) are required if construction costs exceed $150,000.
- Wage Determination: The Davis-Bacon Act applies. Wage Determination OK20260024 (effective 01/02/2026) for Heavy Construction Projects in Le Flore County, Oklahoma, is applicable.
Submission & Evaluation
- Bid Submission Deadline: April 27, 2026, at 2:00 PM Eastern Time.
- Bid Opening: Publicly opened electronically on April 27, 2026, at 3:30 PM Eastern Time via Microsoft Teams.
- Submission Method: Electronically via email to the Contracting Officer, Cathy Boulware (cathy_boulware@ios.doi.gov).
- Evaluation Criteria: Award will be made to the lowest evaluated bid conforming to requirements, considering Price, Responsiveness, and Responsibility (financial resources, ability to meet schedule, performance record, organization, experience, skills, and eligibility). Bids determined to be materially unbalanced may be rejected.
- Mandatory Requirements:
- Active registration in the System for Award Management (SAM.gov).
- Completion of the Abandoned Mine Lands (AML) Contractor Information Form (OMB 1029-0119) for eligibility evaluation under 30 CFR 874.16. Subcontractors receiving 10% or more funding also require AVS evaluation.
- Submission of a Contractor's Qualifications Statement.
- Pre-bid Meeting: Attendance at the site visit on April 9, 2026, at 10:00 AM local time is not mandatory for bid submission, but bidders are responsible for any missed information.
Key Amendments & Clarifications
Amendment 0002, issued April 21, 2026, includes attached Questions and Answers, revised Terms and Conditions, and a corrected Wage Determination. Clarifications indicate that the geographic location requirement for contractors (within 200 miles of Tulsa) will be removed via a future amendment. The 100% Small Business set-aside will be enforced. Wood chipping cannot be substituted for the Air Incinerator.