Y1DA--CON-NRM-668-22-105 Upgrade AHU-09/15 Mechanical Systems
SOL #: 36C26026R0082Solicitation
Overview
Buyer
Veterans Affairs
Veterans Affairs, Department Of
260-NETWORK CONTRACT OFFICE 20 (36C260)
VANCOUVER, WA, 98661, United States
Place of Performance
Spokane, WA
NAICS
Plumbing (238220)
PSC
Construction Of Hospitals And Infirmaries (Y1DA)
Set Aside
No set aside specified
Original Source
Timeline
1
Posted
Apr 14, 2026
2
Last Updated
May 21, 2026
3
Submission Deadline
Jun 2, 2026, 5:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of Veterans Affairs (VA) is soliciting proposals for a Firm-Fixed-Price Construction Contract to upgrade Air Handling Units (AHUs) 09 and 15 Mechanical Systems at the Mann-Grandstaff VA Medical Center in Spokane, WA. This unrestricted, open market procurement has an estimated value between $1,000,000 and $2,000,000. Proposals are due by June 1, 2026, at 10:00 AM PDT.
Scope of Work
This project, identified as 668-22-105, involves the comprehensive replacement of AHU-09 and AHU-15 in Building 1 (Main Hospital). Key tasks include:
- Replacement of air handlers, associated electrical panel boards, breakers, cables, and conduit.
- Integration of Direct Digital Controls (DDC) upgrades with the existing Building Automation System (BAS).
- Replacement of undersized supply and return ducts and trunks.
- Demolition and commissioning services.
- Provision of all supervision, labor, tools, materials, installation, programming, startup, training, O&M documentation, and a one-year warranty.
- Field verification of equipment, materials, and existing conditions.
- Asbestos abatement and management of lead-based paint are required.
- The project will be executed in two phases, focusing on AHU-09 (Level 2) and AHU-15 (Level 5) upgrades.
Contract Details
- Contract Type: Firm-Fixed-Price Construction Contract.
- Estimated Value: Between $1,000,000 and $2,000,000.
- NAICS Code: 238220 (Plumbing, Heating, and Air Conditioning Contractors).
- Set-Aside: Unrestricted / Open Market.
- Period of Performance: 365 calendar days from the Notice to Proceed.
- Place of Performance: Mann-Grandstaff VA Medical Center, 4815 North Assembly Street, Spokane, Washington 99205.
Submission & Evaluation
- Proposals Due: June 1, 2026, by 10:00 AM PDT.
- Submission Method: Electronically to Quyen.Mai@va.gov and Dennis.Einarson@va.gov.
- Proposal Format: Two volumes: Volume 1 – Technical and Past Performance, and Volume 2 – Price/Cost Proposal.
- Evaluation Criteria: Best Value Tradeoff source selection. Technical Approach (Factor 1) and Past Performance (Factor 2) are approximately equal in importance and significantly more important than Price (Factor 3).
- Required Submittals: A Bid Guarantee (10% of bid price or $200,000, whichever is less) and completed Past Performance Questionnaires (PPQs) are mandatory.
- Key Personnel: Offerors must propose a Project Manager, Quality Control Manager, Site Superintendent, and Site Safety & Health Officer with specified qualifications.
- Pre-bid Site Visit: A site visit was held on May 13, 2026 (sign-in sheet available).
Key Requirements & Notes
- Strict adherence to detailed specifications, drawings, and safety requirements, including an Accident Prevention Plan (APP) and Activity Hazard Analyses (AHAs).
- Significant emphasis on Infection Control Risk Assessment (ICRA) measures due to the occupied healthcare environment, requiring barrier construction, negative air pressure, and cleaning protocols.
- Compliance with prevailing wage rates (Wage Determination WA20260114) and subcontracting limitations is required.
- Contractors must comply with FAR Clause 52.222-90, "Addressing DEI Discrimination by Federal Contractors."
- Contractor is responsible for providing temporary heating/cooling, site office, and all equipment/supplies. No Government-Furnished Equipment (GFE).
- Commissioning documentation, demonstration, and training for VA personnel are required.