Y1EZ--Correct FCA Deficiencies Construction - Pre-Solicitation

SOL #: 36C77026R0006Pre-Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
255-NETWORK CONTRACT OFFICE 15 (36C255)
LEAVENWORTH, KS, 66048, United States

Place of Performance

Tucson, AZ

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Other Industrial Buildings (Y1EZ)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Feb 12, 2026
2
Response Deadline
Feb 27, 2026, 8:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA) has issued a Pre-Solicitation Notice / Request for Information (RFI) for the "Correct FCA Deficiencies Construction Project" at the Tucson CMOP, Tucson, Arizona. This RFI is for market research purposes only, seeking capability statements from qualified firms for an anticipated Firm Fixed-Price contract. The opportunity is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. Capability Statements are due by February 27, 2026, at 2:30 PM CST.

Scope of Work

This project addresses deficiencies identified in a 2022 Facility Condition Assessment (FCA) and a 2021 Physical Security Risk Assessment (PSRA) to improve infrastructure and security at the Tucson CMOP. Key components include:

  • Separating the Electrical Energy System (EES) into a dedicated 2-hour fire-rated secure room.
  • Modifying the EES to provide 100% backup for the CMOP.
  • Increasing fuel storage capacity to support a 48-hour emergency supply.
  • Providing an N+1 redundant EES, including a second generator with paralleling switchgear, requiring modifications to the dock and relocation of trash/recycling compactors.
  • Adding HVAC for the space underneath the mezzanine.
  • Bid Alternate 1: Connecting the fire line serving the building to a backflow preventer.
  • Bid Alternate 2: Replacing the roof with a single-ply thermoplastic polyolefin (TPO) membrane system. The project will be phased to minimize impact on CMOP operations.

Contract & Timeline

  • RFI Number: 36C25526R0006
  • Anticipated Contract Type: Firm Fixed Price
  • NAICS Code: 236220 (Commercial and Institutional Building Construction)
  • Business Size Standard: $45.0M
  • Estimated Cost Magnitude: Between $1,000,000 and $5,000,000
  • Place of Performance: Tucson CMOP, 3675 E. Britannia Drive, Tucson, AZ 85706
  • Capability Statement Due: February 27, 2026, 2:30 PM CST
  • Solicitation Expected: On or after March 12, 2026
  • Published Date: February 12, 2026

Submission Requirements

Interested SDVOSBs must submit a Capability Statement (limited to 10 pages) via email to Billie.Cherico@va.gov. The statement should include:

  1. Offeror's name, address, point of contact, phone, email, and DUNS number.
  2. Interest in bidding on the solicitation.
  3. Capability to perform a contract of this magnitude and complexity, with 1-3 comparable project examples from the past 5 years (description, customer, timeliness, satisfaction, dollar value).
  4. CVE certification (if applicable).
  5. Socio-economic status for NAICS 236220 and percentage of self-performed labor.
  6. Joint Venture information (if applicable).
  7. Bonding capability letter from Surety (per contract and aggregate). Offerors must be registered in SAM.gov and, for SDVOSBs, with the SBA Veteran Small Business Certification. At least 15% of the contract performance cost for personnel must be spent on the concern's employees or other eligible SDVOSB concerns.

Additional Notes

This notice is for information and planning only and does not commit the VA to issue a solicitation or award a contract. Responses will not be considered proposals. Questions will only be accepted after the solicitation is published. A pre-bid site visit will be held, with details provided in the solicitation package.

People

Points of Contact

Billie Jo ChericoContract Specialist (Contractor)PRIMARY

Files

Files

Download

Versions

Version 1Viewing
Pre-Solicitation
Posted: Feb 12, 2026