Y1NB--CON-NRM-668-23-101 Construct Chiller Plant & Cooling Towers

SOL #: 36C26026R0003Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
260-NETWORK CONTRACT OFFICE 20 (36C260)
VANCOUVER, WA, 98661, United States

Place of Performance

Spokane, WA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Heating And Cooling Plants (Y1NB)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Mar 19, 2026
2
Last Updated
Apr 29, 2026
3
Submission Deadline
May 21, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA), specifically the Network Contract Office 20, has issued Solicitation 36C26026R0003 for the construction of a Chiller Plant and Cooling Towers at the Mann-Grandstaff VA Medical Center in Spokane, Washington. This project, identified as 668-23-101, is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. Proposals are due by May 21, 2026, at 12:00 PM PDT.

Scope of Work

The project involves constructing a new 4000 gross square foot chiller plant on the roof adjacent to building 44 boiler plant. Key tasks include installing three new chillers and associated support systems (pumps, towers, water treatment, emergency connections), electrical routing for emergency and normal power, modifying the existing loop architecture, and integrating Building Management System (BMS) controls. The contractor will also be responsible for full test and balance (TAB) for the building air system and chillers, commissioning documentation, and training VA personnel on system operations. The period of performance is 630 calendar days.

Contract Details

  • Contract Type: Firm-Fixed-Price
  • Estimated Magnitude: Between $10,000,000 and $20,000,000
  • Set-Aside: 100% Service-Disabled Veteran-Owned Small Business (SDVOSB)
  • NAICS Code: 236220 (Commercial and Institutional Building Construction)
  • Small Business Size Standard: $45 million
  • Place of Performance: Mann-Grandstaff VA Medical Center, Spokane, WA

Submission & Evaluation

Proposals must be submitted electronically by May 21, 2026, 12:00 PM PDT. Evaluation will follow a best value tradeoff source selection procedure, considering Technical Approach, Past Performance, and Price. Technical Approach and Past Performance are approximately equal in importance and significantly more important than Price. A bid guarantee (20% of bid price or $2,000,000, whichever is less) is required. Proposals must be submitted in two volumes: Technical and Past Performance, and Price Proposal. Questions were due by April 30, 2026.

Key Documents & Notes

  • Solicitation 36C26026R0003 and Amendment 0001 (published April 29, 2026) are available.
  • Attachment 1 - Construction SOW: Details the full scope of work.
  • Attachment 2 - Specs: Contains VHA Master Specifications and detailed technical requirements.
  • Attachment 3 - Drawings: Provides comprehensive architectural, structural, mechanical, electrical, plumbing, fire protection, and special systems drawings.
  • Attachment 4 - Wage Rates: Specifies Spokane County prevailing wage rates.
  • Attachment 5 - Limitations on Subcontracting: Requires certification of compliance with VAAR 852.219-75 (85% limit for general construction).
  • Attachment 6 - Contractor Rules of Behavior: Outlines mandatory security protocols for VA information systems.
  • Attachment 7 - Divisional Price Breakout: An Excel template for detailed pricing.
  • Attachment 8 - Past Performance Questionnaire: Required for evaluation.
  • Site Visit: A site visit occurred on April 27, 2026, and the sign-in sheet was provided via Amendment 0001.

Contact Information

Sangmi Kim, Contract Specialist, sangmi.kim@va.gov

People

Points of Contact

Sangmi KimContract SpecialistPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6Viewing
Solicitation
Posted: Apr 29, 2026
Version 5
Solicitation
Posted: Apr 27, 2026
View
Version 4
Solicitation
Posted: Apr 22, 2026
View
Version 3
Solicitation
Posted: Apr 20, 2026
View
Version 2
Pre-Solicitation
Posted: Apr 20, 2026
View
Version 1
Pre-Solicitation
Posted: Mar 19, 2026
View
Y1NB--CON-NRM-668-23-101 Construct Chiller Plant & Cooling Towers | GovScope