H--YOSE-ANNUAL FIRE SUPPRESION INSPECT/TEST

SOL #: 140P8526Q0026Solicitation

Overview

Buyer

Interior
National Park Service
PWR SF/SEA MABO(85000)
SAN FRANCISCO, CA, 94104, United States

Place of Performance

Place of performance not available

NAICS

Building Inspection Services (541350)

PSC

Inspection And Laboratory Services (Except Medical/Dental): Alarm, Signal, And Security Detection Systems (H363)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 17, 2026
2
Last Updated
Mar 5, 2026
3
Submission Deadline
Mar 11, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Park Service (NPS), Yosemite National Park, is soliciting quotes for annual fire suppression system inspection, testing, and inventory services. This is a 100% Total Small Business Set-Aside for a firm-fixed-price commercial services contract. Quotes are due March 11, 2026, by 12:00 P.M. Pacific Time (PT).

Scope of Work

This opportunity requires NFPA-compliant inspection, testing, and inventory of approximately 100 fire protection and life safety systems across various locations within Yosemite National Park, including El Portal, Mather, Yosemite Valley, and Wawona districts. Systems covered include water-based (wet/dry pipe, standpipes, fire pumps), chemical agent, and fire detection/notification systems.

Key tasks involve:

  • Identifying system deficiencies and citing applicable codes.
  • Providing Class C cost estimates for repairs using RS Means CostWorks® or similar.
  • Documenting findings on NFPA forms and creating electronic reports per asset.
  • Providing a comprehensive Executive Summary.
  • Crucially, the contractor shall not perform any maintenance on the fire protection systems.
  • The scope includes annual inspections for fire sprinkler and fire alarm systems; 5-year inspections are excluded. Hydrants are also explicitly excluded.
  • A scissor lift will be required for visual inspection of sprinkler heads in the El Portal Warehouse. Field surveys involve low-level assessments to count system components for a provided spreadsheet.

Contract Details

  • Contract Type: Firm Fixed-Price Commercial Services Contract (RFQ 140P8526Q0026)
  • Set-Aside: 100% Total Small Business Set-Aside (FAR 19.502-2)
  • NAICS Code: 541350 (Building Inspection Services)
  • Small Business Size Standard: $11.5 million
  • Period of Performance: Field work by September 30, 2026; final reports and estimates by October 30, 2026.

Submission & Evaluation

  • Quotes Due: March 11, 2026, by 12:00 P.M. Pacific Time (PT).
  • Submission Method: Emailed quotes only to brian_roppolo@nps.gov.
  • Questions Due: March 4, 2026, by 12:00 P.M. (PT) to brian_roppolo@nps.gov, referencing the solicitation number.
  • Evaluation Factors: Award will be based on the most advantageous offer considering price, proposed project schedule, and past performance.
  • Eligibility: Offerors must be registered in the System for Award Management (SAM).

Key Clarifications & Attachments

  • Access: Escorts are required for building and residential unit access, provided by NPS. Access is available Monday through Friday, 8:00 AM to 5:00 PM.
  • Wage Determination: Attachment 4 provides the Service Contract Act Wage Determination (WD #2015-5661) for Mariposa County, California, which bidders must use for labor cost calculations.
  • Pricing Schedule: Attachment 1 is the pricing schedule for cost proposals.
  • System Inventory: Attachment 3 details the fire suppression and alarm systems to be inspected.
  • Performance Standards: Phase 1 (field work) requires licensed/certified contractors; Phase 2 (documentation/cost estimating) requires NICET Level 2 or equivalent for sprinkler/alarm systems.

People

Points of Contact

Roppolo, BrianPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 3Viewing
Solicitation
Posted: Mar 5, 2026
Version 2
Solicitation
Posted: Feb 25, 2026
View
Version 1
Solicitation
Posted: Feb 17, 2026
View
H--YOSE-ANNUAL FIRE SUPPRESION INSPECT/TEST | GovScope