Z--REPLACE SHADE STRUCTURES IN PICNIC AREAS

SOL #: 140P1226Q0011Solicitation

Overview

Buyer

Interior
National Park Service
IMR INTERMOUNTAIN REGION(1200)
Denver, CO, 80225, United States

Place of Performance

El Paso, TX

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Recreation Facilities (Non Building) (Z2PA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 9, 2026
2
Last Updated
Apr 22, 2026
3
Submission Deadline
Apr 27, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Interior, National Park Service has issued a Solicitation (RFQ 140P1226Q0011) for the replacement of nine shade structures in the picnic areas of Chamizal National Memorial, El Paso, TX. This project is a Firm-Fixed-Price construction contract with an estimated magnitude between $25,000 and $100,000. It is a Total Small Business Set-Aside. Offers are due by April 27, 2026, at 12:00 PM Local Time.

Scope of Work

The project involves the demolition and replacement of nine metal shade structures. This includes the disassembly and removal of existing structures and posts anchored in concrete, followed by the restoration of any damaged concrete slab material using saw cuts for uniform restoration. New structures will feature four steel posts set in concrete, five steel rafters, and 26-gauge steel roofing panels. The entire structural assembly must be painted with Behr Premium Semi-Gloss Direct-To-Metal paint, and flashing installed around exposed sheet metal edges. The contractor is also responsible for repairing three existing concrete pads, removing all waste daily, and using sustainable and environmentally friendly products. Fieldwork must be completed within 60 calendar days after the Notice to Proceed.

Contract Details

  • Solicitation Number: 140P1226Q0011
  • Contract Type: Firm-Fixed-Price Construction Contract
  • Project Magnitude: Between $25,000 and $100,000
  • NAICS Code: 236220 (Commercial and Institutional Building Construction)
  • Size Standard: $45 million
  • Set-Aside: 100% Total Small Business
  • Performance Period: 60 calendar days after Notice to Proceed
  • Bonds: Performance and payment bonds (100% of final award) are required.
  • Wage Requirements: Construction Wage Rate Requirements for El Paso County, TX (DOL WD TX20260245) apply, dictating prevailing wage rates and fringes for various trades.

Submission & Evaluation

Award will be made to the responsible offeror whose quotation conforms to the solicitation and represents the best value, considering technical capability (including experience) and price. Discussions are not anticipated. Offerors must submit bids via email to the Contract Specialist by the deadline.

  • Site Visit: April 15, 2026, 10:00 AM CDT (highly encouraged)
  • Questions Due: April 21, 2026, 12:00 PM CDT
  • Offers Due: April 27, 2026, 12:00 PM Local Time Offerors must have a UEI number, be registered and active in SAM.gov, and have completed Online Representations and Certifications by the solicitation close date. A Technical-Experience Questionnaire (Attachment 2) and Price Schedule (Attachment 3) must be completed.

Key Clarifications

Recent amendments and Q&A documents clarify several points:

  • Concrete: 4000 PSI plant-mixed concrete is acceptable; store-bought sacks meeting this requirement are sufficient.
  • Connections: Steel rafter to steel post connections must be welded; bolted connections are not permitted.
  • Roof Panels: 26-gauge roof panels are required as per the SOW; approved equal or better solutions are not acceptable.
  • Post Embedment: Alternative Means and Methods for anchor bolt connections in lieu of specified concrete embedment will not be considered; SOW requirements must be followed.
  • Site Access: No access to dirt walkways; contractors may use on-site park restrooms (maintaining cleanliness).
  • Safety: An Accident Prevention Plan does not replace a separate Safety Plan.
  • Design: New shade structures will use a standardized design matching specifications for height, layout, and configuration. No existing drawings are available; photos will be provided.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Solicitation
Posted: Apr 22, 2026
Version 3
Solicitation
Posted: Apr 10, 2026
View
Version 2
Solicitation
Posted: Mar 25, 2026
View
Version 1
Pre-Solicitation
Posted: Mar 9, 2026
View
Z--REPLACE SHADE STRUCTURES IN PICNIC AREAS | GovScope