CT SWITCHGEAR REPLACEMENT STAMPEDE PP
SOL #: 140R2026R0007Solicitation
Overview
Buyer
Interior
Bureau Of Reclamation
MP-REGIONAL OFFICE
SACRAMENTO, CA, 95825, United States
Place of Performance
Place of performance not available
NAICS
Electrical Contractors and Other Wiring Installation Contractors (238210)
PSC
Repair Or Alteration Of Epg Facilities Other, Including Transmission (Z2MZ)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
Mar 20, 2026
2
Last Updated
Jun 18, 2026
3
Submission Deadline
Jun 28, 2026, 12:00 AM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Interior, Bureau of Reclamation has issued a Solicitation (RFP 140R2026R0007) for the Stampede Power Plant Switchgear Replacement project. This is a firm-fixed price construction contract to replace outdated electrical components at the Stampede Dam and Powerplant in Truckee, CA. This opportunity is a Total Small Business Set-Aside. Proposals are due June 27, 2026, at 1700 local time.
Scope of Work
The project involves the removal and replacement of critical electrical infrastructure:
- Removal of the existing DCA Switchgear 480-Volt feeder enclosure and five (5) breakers, and replacement with a new arc-resistant enclosure, five (5) new arc-limiting 480-Volt draw-out circuit breakers, associated equipment, frames, and buss work. One spare breaker is also required.
- Removal and replacement of the existing DCB enclosure and integrated molded case circuit breaker distribution panel.
- Removal and replacement of existing molded case circuit breaker distribution panels D1A and DCC.
- The contractor must provide methods for ensuring minimal downtime, electrical safety, arc flash mitigation, quality control, and compliance with all applicable codes and safety requirements. This includes sequencing, phasing, and anticipated construction methods.
- Backup generator power, restroom facilities, and hand wash stations are required.
Contract Details
- Contract Type: Firm-Fixed Price
- Estimated Value: $250,000.00 to $500,000.00
- Period of Performance: Work must commence within 7 calendar days after award and be completed within 150 calendar days after receiving notice to proceed.
- Set-Aside: Total Small Business (FAR 19.5)
- NAICS Code: 238210 (Electrical Contractors and Other Wiring Installation Contractors) with a size standard of $19 million.
- Bonds: 100% Performance and Payment Bonds are required within 10 calendar days after award. An offer guarantee is not required.
Submission & Evaluation
- Proposal Submission Deadline: June 27, 2026, at 1700 local time.
- Site Visit: An organized site visit is scheduled for June 9, 2026, at 10:00 AM PST at Stampede Powerplant, 501 Stampede Dam Rd, Truckee, CA 96161.
- Questions Deadline: Five (5) days after the site visit at 1700 PST.
- Evaluation Factors: Award will be made to the responsible offeror submitting the lowest evaluated price of proposals meeting or exceeding acceptability standards for non-cost/price factors. Evaluation will consider Technical Capability (Technical Approach, Construction Schedule, Experience) and Past Performance, with no trade-offs.
- Eligibility: Prospective contractors must be actively registered in SAM.gov. Offerors must submit current and valid business license(s) for electrical construction work.
- Access to Documents: Offerors must execute a Non-Disclosure Agreement (NDA) to obtain access to Drawings and the Statement of Work.
Contact Information
- Primary Contact: Roxana Ahola (rahola@usbr.gov, 916-978-5549)