Z--JELA 311263 - Canal Backfill Restoration
SOL #: 140P2026R0036Solicitation
Overview
Buyer
Interior
National Park Service
DSC CONTRACTING SERVICES DIVISION
Denver, CO, 80225, United States
Place of Performance
New Orleans, LA
NAICS
Site Preparation Contractors (238910)
PSC
Maintenance Of Canals (Z1KB)
Set Aside
No set aside specified
Original Source
Timeline
1
Posted
Mar 19, 2026
2
Last Updated
Apr 30, 2026
3
Submission Deadline
May 7, 2026, 8:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The National Park Service (NPS), through its DSC Contracting Services Division, is soliciting proposals for Canal Backfill Restoration (JELA 311263) at the Jean Lafitte National Historical Park and Preserve in New Orleans, LA. This Small Business Set-Aside opportunity aims to restore natural hydrology and wetland functions. The estimated magnitude of construction is between $1 Million and $5 Million. Proposals are due May 7, 2026.
Scope of Work
This project involves the backfilling and restoration of a 9,200-9,500 linear foot section of the Parallel Canal within the Barataria unit. Key tasks include:
- Degrading spoil banks and dikes using marsh buggies or barge-mounted excavators.
- Placing on-site spoil bank material into the canals, or chipping vegetation in place for navigable canals.
- Gapping approximately 25% of the spoilbank on the east side of the Parallel Canal to restore hydrological connections (e.g., 24 gaps of ~100 ft each). No check meander will be installed.
- Revegetation of reclaimed areas with native woody species.
- Implementing erosion and sediment control measures.
- Compliance with detailed engineering drawings and specifications (NAICS 238910, PSC Z1KB).
Contract Details
- Contract Type: Firm-Fixed-Price (FFP)
- Period of Performance: 10 calendar days to begin work after Notice to Proceed, with 90 calendar days for completion.
- Bonds: Bid, Performance, and Payment Bonds are required.
- Liquidated Damages: $3,734.00 per calendar day for delays.
- Set-Aside: Small Business Set-Aside.
- Size Standard: $19 Million.
Submission & Evaluation
- Proposals Due: May 7, 2026, by 4:00 PM ET.
- Submission Method: Offers and questions must be submitted via email to the Contracting Officer.
- Evaluation: A Best Value Tradeoff Process will be used, considering technical approach, project experience, key personnel experience, past performance, and price. Non-price factors are significantly more important than price.
- Site Visit: Not officially scheduled, but the canal area is public and accessible.
- Requirements: Offerors must have an active registration in SAM and a UEI number, and represent NAICS 238910. Required attachments include General References, Past Performance, and Project Experience Questionnaires.
Contact Information
- Contracting Officer: Shellie Murphy
- Email: shellie_murphy@nps.gov
- Phone: 720-610-2690
People
Points of Contact
Murphy, ShelliePRIMARY