Z--JELA 311263 - Canal Backfill Restoration

SOL #: 140P2026R0036Solicitation

Overview

Buyer

Interior
National Park Service
DSC CONTRACTING SERVICES DIVISION
Denver, CO, 80225, United States

Place of Performance

New Orleans, LA

NAICS

Site Preparation Contractors (238910)

PSC

Maintenance Of Canals (Z1KB)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 19, 2026
2
Last Updated
Apr 30, 2026
3
Submission Deadline
May 13, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Park Service (NPS), through its DSC Contracting Services Division, is soliciting proposals for Canal Backfill Restoration (JELA 311263) at the Jean Lafitte National Historical Park and Preserve in New Orleans, LA. This Small Business Set-Aside opportunity, estimated between $1 Million and $5 Million, aims to restore natural hydrology and wetland functions. Proposals are due by May 13, 2026, at 8:00 PM ET.

Scope of Work

This project involves comprehensive canal restoration within the Barataria unit. Key requirements include:

  • Backfilling approximately 9,200-9,500 linear feet of spoil bank in the Parallel Canal using on-site material.
  • Degrading and backfilling the entire eastern spoilbank of the Parallel Canal (which is also the western spoilbank of the Pipeline Canal) to the same elevation as surrounding wetlands.
  • Gapping approximately 25% of the spoilbank on the east side of the Parallel Canal (e.g., 24 gaps of 100 ft each).
  • Revegetation of reclaimed areas with bald cypress saplings (3+ feet tall, 1-gallon pots, planted 20 feet on center between November 1 and February 28). Saplings must be contractor-provided from coastal Louisiana growers.
  • Implementation of erosion and sediment control measures, including temporary floating turbidity curtains.
  • No plugs or meanders are to be constructed for the Parallel Canal portion of this project.

Contract Details

  • Contract Type: Firm-Fixed-Price (FFP), Stand-Alone Contract.
  • Period of Performance: 10 calendar days to begin performance after Notice to Proceed (NTP), with 90 calendar days to complete the work.
  • Magnitude: $1 Million - $5 Million.
  • Bonds: Bid, Performance, and Payment Bonds are required.
  • Liquidated Damages: $3,734.00 per calendar day for delays.

Eligibility & Submission

  • Set-Aside: Small Business Set-Aside.
  • NAICS Code: 238910 (Site Preparation Contractors) with a $19 Million size standard.
  • SAM Registration: Offerors must have an active registration in SAM and a UEI number at the time of offer submission and award.
  • Proposal Due: May 13, 2026, 8:00 PM ET.
  • Submission Method: Proposals and questions must be submitted via email to the Contracting Officer.

Evaluation Criteria

Proposals will be evaluated using a Best Value Tradeoff Process, considering technical approach, project experience, key personnel experience, past performance, and price. Non-price factors are significantly more important than price.

Key Clarifications & Amendments

Two amendments (0001 and 0002) have been issued to post answers to vendor questions. These clarifications detail planting requirements, material sourcing, and construction methods for canal and embankment work. Specifically, they confirm bald cypress sapling specifications and source, clarify that no plugs or meanders are to be constructed for the Parallel Canal, and provide specifics on the eastern embankment treatment and spoilbank gapping. No changes to due dates or submission rules were indicated in the amendment summaries, but the latest response date from metadata is May 13, 2026.

People

Points of Contact

Murphy, ShelliePRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5
Solicitation
Posted: Apr 30, 2026
View
Version 4Viewing
Solicitation
Posted: Apr 29, 2026
Version 3
Solicitation
Posted: Apr 24, 2026
View
Version 2
Solicitation
Posted: Apr 7, 2026
View
Version 1
Pre-Solicitation
Posted: Mar 19, 2026
View