Z--KALA-REPLACE HVAC AND HUMIDITY CONTROL SYSTEM IN T
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Interior, National Park Service (NPS), is soliciting bids for the replacement of the HVAC and Humidity Control System in the Parks Curatorial Facility at Kalaupapa National Historical Park (KALA), Molokai, HI. This is a competitive 100% Small Business Set-Aside Invitation for Bid (IFB). The project aims to ensure precise environmental control for museum collections. Bids are due May 8, 2026, at 12:00 PM Mountain Time.
Scope of Work
This project involves the replacement of the existing air-conditioning system and the installation of new mini-split air-conditioning systems (Fan Coil Units and Air Cooled Condensing Units) and four commercial dehumidifier units. The primary objective is to maintain temperature between 55-68 degrees Fahrenheit (+/- 5 degrees) and relative humidity between 40-55% (+/- 5%) in museum collection storage rooms. The scope includes associated electrical work, installation of reinforced concrete pads for ACUs (with a potential deduct option if the park completes this), and compliance with detailed construction specifications and drawings. The NPS will manage the demolition, removal, and disposal of existing air-conditioning systems.
Contract Details
- Contract Type: Firm-Fixed-Price (FFP) Invitation for Bid (IFB).
- Set-Aside: 100% Small Business Set-Aside.
- NAICS Code: 238220 (Size Standard: $19M).
- Period of Performance: Work must commence within 7 calendar days of Notice to Proceed (NTP) and be completed within 150 calendar days of NTP.
- Payment & Performance Bonds: Standard Forms 25A (Payment Bond) and 25 (Performance Bond) are required.
- Wage Determination: Davis-Bacon Act Wage Determination HI20260001 (Hawaii Statewide) applies, requiring adherence to prevailing wage rates.
- Pricing: Bidders must provide a lump sum price for CLIN 00010, "REPLACE HVAC AND HUMIDITY CONTROL SYSTEM IN THE PARKS CURATORIAL FACILITY," using the provided Contract Bid Schedule.
Submission & Evaluation
- Bid Submission: Electronic bids must be sent to PWR_Sealed_Bids@nps.gov. The email subject line must be "140P8226B0004 Replace HVAC in Curatorial at Kalaupapa National Historical Park (KALA)". The bid package should be a single PDF file, not exceeding 34 MB.
- Bid Due Date: May 8, 2026, at 12:00 PM Mountain Time.
- Bid Opening: Virtual, via Microsoft Teams, on May 11, 2026, at 12:00 PM Mountain Time.
- Questions Deadline: Written questions were due by April 20, 2026, 12:00 PM Local Time (Hawaii). Responses to RFIs have been provided.
- Required Documents: Bidders must acknowledge all solicitation amendments, include their SAM registered UIED number, provide original signatures, and submit Bid Guarantees.
Key Considerations
The project is located in a remote area, Kalaupapa National Historical Park, Molokai, HI, which presents specific logistical challenges for material delivery (e.g., reliance on an annual barge, with potential project rescheduling if the August 2026 barge is missed). Government-furnished items may include heavy equipment, ladders, vehicles, barge delivery space, and housing. A general Buy American Act (BAA) waiver has been issued for ductless HVAC mini-splits due to the unavailability of US-manufactured units meeting required specifications. Alternative products must meet or exceed the salient characteristics of specified Mitsubishi models, use R-454b refrigerant, and have readily available parts and service on Oahu.