Z--MEDFORD HOT WATER HEATER REPLACEMENT- BLM MEDFORD
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Bureau of Land Management (BLM) Oregon State Office is soliciting proposals for the replacement of hot water heaters at the Medford Interagency Office in Medford, OR. This project involves the demolition of existing units, installation of new high-efficiency water heaters, reconfiguring associated piping and venting, and electrical work. This is a Total Small Business Set-Aside. Proposals are due March 26, 2026, at 12:00 PM PT.
Scope of Work
The contractor will be responsible for:
- Demolition and removal of two existing hot water heater tanks and associated hardware.
- Installation of new, high-efficiency water heaters (130,000 BTU/Hr, 100 gallons, Energy Star, 98% thermal efficiency).
- Reconfiguration of existing water heating system piping and vent piping, including the installation of a new ASME-rated 2.5-gallon expansion tank. Concentric venting is acceptable, and existing B-vent can be utilized or removed and capped.
- All necessary electrical work.
- Demonstration and training for BLM site personnel.
- Compliance with environmental regulations, including developing a Spill Prevention, Control, and Countermeasure (SPCC) Plan and maintaining a Spill Containment Kit (SCK) on-site.
- Coordination with the BLM site manager to minimize disruption.
Contract Details
- Type: Firm Fixed-Price Construction Contract.
- Estimated Magnitude: Between $30,000 and $40,000.
- Period of Performance: Work to begin within 10 calendar days and be completed within 30 calendar days after Notice to Proceed.
- Bonds: Payment Bond required for awards over $35,000; both Payment and Performance Bonds for awards over $150,000.
- Warranty: 1-year labor warranty (FAR 52.246-21) and manufacturer's warranty for equipment.
- NAICS: 238220 (Plumbing, Heating, and Air-Conditioning Contractors), Size Standard: $19 million.
Submission & Evaluation
- Proposals Due: March 26, 2026, at 12:00 PM PT.
- Submission Method: Electronically via email to hnordholm@blm.gov and fsapidajr@blm.gov.
- Evaluation Factors: Proposals will be evaluated based on two factors: Technical (Relevant Experience) and Price.
- Technical: Requires demonstration of specialized and relevant experience in hot water heater replacement, with at least two similar projects completed within the last six years. Specific project details (customer, contract number, scope, value, dates) are required.
- Price: Evaluated for fairness and reasonableness.
- Award Basis: Lowest Price Technically Acceptable (LPTA).
Key Updates & Attachments (Amendment 0001)
An amendment (0001) updated the requirements for Relevant Experience under Evaluation Factor 1, emphasizing specialized experience in hot water heater replacement. It also provided new attachments:
- Q&A: Clarifies details on roof type, seismic design, venting, expansion tanks, and equipment pads.
- Site Visit Sign-In Sheet: Lists companies that attended the site visit on March 11, 2026.
- 2009 Roof Replacement Specifications: Provides detailed specifications for a modified bituminous membrane roofing system, which may be relevant for understanding the building environment.
- Wage Determination: OR20260103 for Jackson and Josephine Counties, Oregon, detailing prevailing wage rates.
Contact Information
- Primary Contact: Jacqueline Sotelo
- Email: jsotelo@blm.gov
- Phone: 503-808-6568