Z--Muskrat Water Well Repair

SOL #: 140L5726Q0008Solicitation

Overview

Buyer

Interior
Bureau Of Land Management
UTAH STATE OFFICE
SALT LAKE CITY, UT, 84101, United States

Place of Performance

Place of performance not available

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Maintenance Of Sewage And Waste Facilities (Z1ND)

Set Aside

No set aside specified

Timeline

1
Posted
Feb 13, 2026
2
Last Updated
Mar 9, 2026
3
Submission Deadline
Mar 12, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Bureau of Land Management (BLM), Utah State Office, is soliciting quotes for Muskrat Water Well Repairs at the Muskrat Fire Station in Grantsville, Tooele County, UT. This project involves comprehensive repair and rehabilitation of an existing potable drinking water well. This acquisition is a 100% Total Small Business Set-Aside. Quotes are due March 12, 2026, by 3:00 PM Mountain Time.

Scope of Work

The project requires a Licensed Water Well Driller in Utah to perform the following:

  • Well Rehabilitation: Clean out the well, scrub and clean the existing 6-inch casing, and re-perforate specific sections (350-360 ft and 370-380 ft).
  • Deepening & Lining: Drill an additional 20 feet to create a 402-foot deep borehole and line the well with new 5-inch Schedule 40 steel casing, perforating it to match specified sections.
  • Equipment Installation: Install a new submersible pump, motor, drop pipe, and wire, which will be provided by the Government (Franklin Electric pump/motor, 1-1/4 inch Schedule 120 PVC pipe, 8 AWG submersible wire).
  • Testing & Disinfection: Test pump the well for a minimum of 10 hours to determine specific yield and drawdown, and disinfect the well according to AWWA C654-21 standards.
  • Clarifications (Amendment 0001): The well does not have a cover, uses a pitless adapter, and the BLM will handle the digging for pitless adapter removal and reinstallation.

Contract Details

  • Contract Type: Firm Fixed Priced (FFP), Single Award Contract.
  • Magnitude: Estimated between $25,000.00 and $100,000.00.
  • Period of Performance: 45 days from Notice to Proceed, with the well required to be in service by the end of May 2026.
  • Place of Performance: Muskrat Fire Station, 2043 South Skull Valley Highway, Grantsville, Utah 84029.
  • NAICS Code: 237110 – Water & Sewer Line & Related Structures Construction (Small Business Size Standard: $45.0M).
  • PSC Code: Z1NE – Maintenance of Water Supply Facilities.
  • Bonds: Payment bond required for awards over $35,000.00; both performance and payment bonds for awards over $150,000.00.
  • Wage Determination: Prevailing wage rates per General Decision Number UT20260097 apply.

Submission & Evaluation

  • Questions Due: March 04, 2026, by 3:00 PM Mountain Time (via email).
  • Quote Due: March 12, 2026, by 3:00 PM Mountain Time (via email to tbluntmayes@blm.gov).
  • Submission Format: Price and technical volumes must be separate documents. Quotes must be valid for a minimum of 60 days.
  • Evaluation: Award will be made using a Low Price FAR Part 13 process to the responsible quoter with the lowest total price conforming to all solicitation requirements.

Additional Notes

  • Site Visit: No formal site visit is scheduled, but prospective quoters are strongly encouraged to visit the site.
  • SAM Registration: Active registration in the System for Award Management (SAM) is required for award eligibility.

People

Points of Contact

Blunt Mayes, ToriPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 4
Solicitation
Posted: Mar 9, 2026
View
Version 3Viewing
Solicitation
Posted: Mar 4, 2026
Version 2
Solicitation
Posted: Feb 27, 2026
View
Version 1
Pre-Solicitation
Posted: Feb 13, 2026
View
Z--Muskrat Water Well Repair | GovScope