Olympic National Park REHAB HURRICANE RIDGE WATER
SOL #: 140P8326R0002Solicitation
Overview
Buyer
Interior
National Park Service
SER NORTH MABO (53000)
GATLINBURG, TN, 37738, United States
Place of Performance
Place of performance not available
NAICS
Water and Sewer Line and Related Structures Construction (237110)
PSC
Maintenance Of Water Supply Facilities (Z1NE)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
Jan 13, 2026
2
Last Updated
Mar 13, 2026
3
Submission Deadline
Mar 13, 2026, 7:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The National Park Service (NPS), under the Department of the Interior, is soliciting proposals for the Rehabilitation of the Hurricane Ridge Water System at Olympic National Park, WA. This is a Total Small Business Set-Aside opportunity for a Firm-Fixed Price contract. The project involves comprehensive upgrades to the park's water infrastructure. Proposals are due March 13, 2026, by 12:00 PM local time.
Scope of Work
The project entails the rehabilitation of the existing water storage and distribution system for the Group A public water system ID NP390 at Hurricane Ridge. Key tasks include:
- Replacement of tank fill and distribution system piping, specifically DR11 HDPE pipe.
- Demolition and disposal of obsolete above-ground and below-ground infrastructure.
- Rehabilitation of the 100,000-gallon dual-chamber cast-in-place reinforced concrete water storage reservoir.
- Installation of a new well pump control panel and associated components.
- Provision for remote monitoring capabilities for key water system parameters.
- New Work Items (per Addendum 2): Installation of a new dry-barrel fire hydrant assembly (including associated accessibility improvements) and an underground conduit extension for future electrical service. Costs for these new items must be incorporated into CLIN 001 (Water Distribution System Replacement).
- Compliance with all applicable federal, state, and local regulations, including environmental protection, safety, and waste management. Davis-Bacon Act wage rates (WA20250046) apply for heavy construction, including water and sewer line construction in Grays Harbor County, Washington.
Contract Details
- Contract Type: Firm-Fixed Price.
- Period of Performance: To begin within 10 calendar days after notice to proceed and complete within 200 calendar days after receiving notice to proceed.
- NAICS Code: 237110 (Water and Sewer Line and Related Structures Construction) with a small business size standard of $39.5M.
- Set-Aside: Total Small Business Set-Aside (FAR 19.5).
- Limitations on Subcontracting: A worksheet is required to demonstrate compliance with the 85% threshold for prime and Similarly Situated Subcontractor (SSS) participation for general construction.
Submission & Evaluation
- Proposals Due: March 13, 2026, by 12:00 PM local time.
- Submission Method: Electronically via email to michael.davidson@nps.gov. Proposals must be submitted in separate VOLUMES (I and II), with each email attachment no larger than 30 MB.
- Registration: Offerors must be registered in the System for Award Management (SAM).
- Evaluation Process: Best Value Continuum Tradeoff Process, considering Technical Capability, Past Performance, and Price. Technical and Past Performance are weighted equally and are approximately equal to Price.
- Key Evaluation Factors:
- Technical Capability: Quality of impact minimization plan, critical path construction schedule, and relevant prior experience.
- Past Performance: Quality, timeliness, business relations, and cost control, assessed via a Past Performance Questionnaire.
- The Government intends to award without discussions but reserves the right to hold discussions if necessary.
Additional Notes
- A site visit will NOT be held.
- Addendum 1 provides corrections and clarifications to drawings and specifications, including details on Hurricane Ridge access, updated target start dates (2026), and requirements for an Asbestos Cement Pipe (ACP) Demolition Plan.
- Addendum 3 provides visual context with numerous photos of the existing water system components.
- A Contract Price Schedule Template is provided for submitting pricing for base and option CLINs, including Water Distribution System Replacement, Water System Controls, Water Storage Tank Rehabilitation, and options for Demolition and Remote Monitoring.
People
Points of Contact
Davidson, MichaelPRIMARY
Files
Files
No files attached to this opportunity