Z--Olympic National Park REHAB HURRICANE RIDGE WATER

SOL #: 140P8326R0002Solicitation

Overview

Buyer

Interior
National Park Service
SER NORTH MABO (53000)
GATLINBURG, TN, 37738, United States

Place of Performance

Place of performance not available

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Maintenance Of Water Supply Facilities (Z1NE)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 13, 2026
2
Last Updated
Mar 13, 2026
3
Submission Deadline
Mar 13, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Interior, National Park Service, is soliciting proposals for the Rehabilitation of the Hurricane Ridge Water System at Olympic National Park, Washington. This Total Small Business Set-Aside opportunity seeks a firm-fixed-price contract for comprehensive water infrastructure upgrades. Proposals are due March 13, 2026, by 12:00 PM local time.

Scope of Work

This project involves the rehabilitation of the existing Group A public water system ID NP390 Hurricane Ridge. Key requirements include:

  • Replacement of tank fill and distribution system piping.
  • Demolition and disposal of obsolete above-ground and below-ground infrastructure.
  • Rehabilitation of the 100,000-gallon dual-chamber cast-in-place reinforced concrete water storage reservoir.
  • Installation of a new well pump control panel and associated components.
  • Provision for remote monitoring capabilities for key water system parameters.
  • New work items include the installation of a dry-barrel fire hydrant assembly with associated components and an underground conduit extension for future electrical service. Costs for these must be integrated into CLIN 001.
  • The contractor is responsible for draining, managing, and refilling the water storage reservoir.
  • Trenchless methods (e.g., Close Tolerance Pipe Slurry) are explicitly not acceptable due to archaeological sensitivity. The contractor must verify waterline locations in the field.

Contract Details & Timeline

  • Contract Type: Firm-Fixed Price.
  • Period of Performance: April 1, 2026, to October 18, 2026.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • NAICS Code: 237110 (Water and Sewer Line and Related Structures Construction) with a $39.5M size standard.
  • Wage Determination: The applicable Davis-Bacon Wage Determination is WA20260022 for Clallam County, Washington.

Submission & Evaluation

Proposals must be submitted electronically via email to michael.davidson@nps.gov. The subject line must follow the format: "140P8326R0002, OLYM – Rehabilitate Water System at Hurricane Ridge, Olympic National Park, WA, email X of Y". Submissions should be in separate VOLUMES (I and II), with each email attachment not exceeding 30 MB. Offerors must be registered in SAM. Evaluation will follow a Best Value Continuum Tradeoff process, considering Technical Capability, Past Performance, and Price. Technical and Past Performance are weighted equally and are approximately equal to Price. Key evaluation factors include the quality of the impact minimization plan, critical path construction schedule, relevant prior experience, quality, timeliness, business relations, and cost control. Past Performance information should be submitted in Volume I, and CPARS evaluations are acceptable.

Key Attachments & Notes

Important documents include the Contract Price Schedule, Relevant Project Experience Questionnaire, Limitations on Subcontracting Worksheet, Specifications, and Detailed Engineering Drawings. Addendum No. 1 provides contract document corrections and clarifications, including requirements for an Asbestos Cement Pipe (ACP) Demolition Plan. Addendum No. 3 provides related photos. No site visit will be held. The Government intends to award without discussions but reserves the right to hold them.

People

Points of Contact

Davidson, MichaelPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4
Solicitation
Posted: Mar 13, 2026
View
Version 3Viewing
Solicitation
Posted: Mar 4, 2026
Version 2
Solicitation
Posted: Feb 11, 2026
View
Version 1
Pre-Solicitation
Posted: Jan 13, 2026
View
Z--Olympic National Park REHAB HURRICANE RIDGE WATER | GovScope