Z1DA--565-22-7005 | EHRM Infras Upgrades | Fayetteville, NC
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of Veterans Affairs (VA), Program Contracting Activity Central (PCAC), is soliciting proposals for EHRM Infrastructure Upgrades Construction at the Fayetteville Veterans Administration Medical Center (VAMC) in Fayetteville, NC. This project involves comprehensive IT and infrastructure modernization. The estimated magnitude is between $20,000,000 and $50,000,000. This is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. Proposals are due February 23, 2026.
Scope of Work
This Design-Bid-Build (DBB) project requires all labor, project management, materials, tools, supplies, and equipment for EHRM construction. Key requirements include:
- Replacement of the entire campus Information Technology (IT) infrastructure.
- Installation of new telecommunication rooms and new interior/exterior fiber optics.
- Renovation of the data center and recabling of all telecommunications with Cat6A.
- Supporting electrical and HVAC infrastructure upgrades.
- General construction, carpentry, mechanical, electrical, plumbing, and utilities, including necessary removal of existing structures.
Contract Details
- Contract Type: Firm-Fixed-Price.
- Period of Performance: 731 Calendar Days after Notice to Proceed.
- Estimated Magnitude: $20,000,000 to $50,000,000.
- NAICS Code: 236220 with a size standard of $45.0 million.
Submission & Evaluation
Proposals must be submitted via email to Scott.Elias@va.gov and Mario.Hairston@va.gov. Submissions require three volumes (Technical, Price, Administrative), each as a searchable PDF, attached to a separate email, and less than 5MB. Evaluation will be conducted using Lowest Price Technically Acceptable (LPTA) procedures, with award made to the offeror representing the "best value." Evaluation factors include:
- Factor 1: Qualifications (Technical)
- Factor 2: Key Subcontractors (Technical)
- Factor 3: Project Execution (Technical)
- Factor 4: Price
Eligibility & Set-Aside
This procurement is a 100% set-aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns. Offerors must be certified as SDVOSBs by the SBA and listed in the SBA certification database at the time of proposal submission and award. Offers from other than SDVOSB concerns will not be considered.
Key Dates & Actions
- Technical Questions Cut-off: February 9, 2026.
- Secondary Site Visit: February 5, 2026, at 10:00 AM ET, 2300 Ramsey Street, Fayetteville Hospital Main Entrance. POC: Andamo Ford. (An initial site visit was scheduled for January 29, 2026).
- Proposal Submission Deadline: February 23, 2026, by 14:00 local time.
- A bid guarantee (SF 24) is required (not less than 20% of proposal price, not to exceed $3,000,000).
- Payment and Performance Bonds (SF 25A and SF 25) are required.
- Offerors are responsible for monitoring SAM.gov for amendments.
Important Attachments
- Attachment A - Wage Rates: Specifies prevailing wage rates for Cumberland and Hoke Counties, NC, under the Davis-Bacon Act.
- Attachment E - Limitations on Subcontracting - Construction: Requires certification of compliance with 85% subcontracting limitation to non-SDVOSB/VOSB firms.
- Attachment G - Key Personnel: Qualification forms for Project Manager, Onsite Superintendent, Site Safety & Health Officer (SSHO), and CQC System Manager.
- Attachment H - HEFP SEP Design Alerts: Provides critical technical specifications and guidance for EHRM projects, including telecommunication infrastructure, HVAC, and power distribution.
- Attachment I - Division Pricing Template: Excel spreadsheet for detailed pricing breakdown by construction division.
- Attachment F - Key Subcontractor Information (KSI): Form for providing details on up to three key subcontractor projects, demonstrating complexity in Division 27 and a minimum value of $5 million.