Z1DA--Improve Central Utility Plant VAMC Las Vegas, NV Project 593-22-350
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of Veterans Affairs (VA) is soliciting proposals for a Firm Fixed-Price construction contract to Improve the Central Utility Plant (CUP) at the VA Southern Nevada Healthcare System (VASNHS) in Las Vegas, NV. This project, estimated between $5,000,000 and $10,000,000, is a Total Service-Disabled Veteran Owned Small Business (SDVOSB) set-aside. Proposals are due February 17, 2026, at 2:00 PM PST.
Scope of Work
This project involves comprehensive upgrades and replacements within the Central Utility Plant. Key tasks include:
- Replacing aging equipment and installing catwalk access.
- Correcting cooling tower heights and incorporating fuel oil monitoring into automated controls.
- Upgrading boiler room systems, water softener piping, and condensate return tanks.
- Automating back-up pumps and the fuel oil system, integrating fuel tank systems.
- Separating condenser pumps onto dedicated power sources and replacing existing condenser pumps and Variable Frequency Drives (VFDs).
- Upgrading facility-wide Lutron lighting controls and adding ladders/stairs in the chiller room.
- Replacing chilled water pumps and industrial water pumps. The work must be phased to ensure continuous medical center operations.
Contract Details
- Contract Type: Firm Fixed-Price Construction
- Magnitude: $5,000,000 to $10,000,000
- Period of Performance: 360 calendar days from Notice to Proceed (NTP).
- Place of Performance: VA Southern Nevada Healthcare System, 6900 N. Pecos Rd, N. Las Vegas, NV 89086.
- Set-Aside: Total Service-Disabled Veteran Owned Small Business (SDVOSB). Offerors must be registered in SAM.gov and certified on the SBA Small Business Search website.
- Bonds: A bid bond is required with the proposal. Performance and payment bonds will be required from the successful offeror.
- Award Basis: Lowest priced proposal that is responsive to the solicitation.
- Estimated Award Date: On or around March 23, 2026.
Submission & Evaluation
- Proposals Due: February 17, 2026, at 2:00 PM PST.
- Submission Method: Via email to christopher.whipple@va.gov and Cc: daniel.jhun@va.gov.
- Questions/RFIs Due: January 30, 2026, 10:00 AM PST, using the provided RFI form.
- Pre-proposal Site Visit: A site visit was conducted on January 22, 2026. The attendee list is available as an amendment.
- Mandatory Attachments: Bidders must use the provided Price Breakdown template and submit the VAAR 852.219-75 certification regarding subcontracting limitations (not more than 85% to non-SDVOSB/VOSB for general construction).
Special Requirements
The project requires strict adherence to VA Personal Identity Verification (PIV) card access procedures, VHA Infection Control Risk Assessment (ICRA), and Pre-Construction Risk Assessment (PCRA) protocols. Comprehensive 3rd party inspections, commissioning, hazardous materials removal, HIPAA compliance, and detailed phasing/logistics plans are mandatory. Compliance with federal wage determinations for Clark County, NV, is also required.
Contacts
- Contract Specialist: Christopher Whipple (christopher.whipple@va.gov)
- Contracting Officer: Daniel Jhun (daniel.jhun@va.gov)