Z1DA--Improve Central Utility Plant VAMC Las Vegas, NV Project 593-22-350

SOL #: 36C26126R0004Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
261-NETWORK CONTRACT OFFICE 21 (36C261)
MATHER, CA, 95655, United States

Place of Performance

Place of performance not available

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Maintenance Of Hospitals And Infirmaries (Z1DA)

Set Aside

No set aside specified

Timeline

1
Posted
Oct 28, 2025
2
Last Updated
Feb 27, 2026
3
Submission Deadline
Feb 27, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA), Network Contract Office 21, is soliciting proposals for a Firm-Fixed Price construction contract to Improve the Central Utility Plant (CUP) at the VA Southern Nevada Healthcare System in Las Vegas, NV (Project 593-22-350). This opportunity is a 100% Service-Disabled Veteran Owned Small Business (SDVOSB) set-aside. Proposals are due by February 27, 2026, at 14:00 PST.

Scope of Work

This project involves comprehensive upgrades and replacements within the Central Utility Plant. Key tasks include:

  • Replacing aging CUP equipment, including the heat recovery system, water softener piping (with stainless steel and a polisher), and a corroded condensate return/surge tank.
  • Installing catwalk access for existing equipment and extending catwalks in the chiller room.
  • Correcting cooling tower heights and installing secondary water supply to cooling towers.
  • Incorporating fuel oil monitoring into automated controls and automating back-up pumps and the fuel oil system.
  • Separating condenser pumps onto dedicated power sources and replacing chilled water pumps, industrial water pumps, and their Variable Frequency Drives (VFDs).
  • Upgrading facility-wide Lutron lighting controls.
  • Providing all necessary labor, materials, equipment, and supervision. The project will be phased to ensure continuous medical center operations.

Contract Details

  • Contract Type: Firm-Fixed Price construction.
  • Magnitude: Estimated between $5,000,000 and $10,000,000.
  • Period of Performance: 360 calendar days from the Notice to Proceed.
  • Place of Performance: VA Southern Nevada Healthcare System, 6900 N. Pecos Rd, N. Las Vegas, NV 89086.
  • Bonds: An offer guarantee (bid bond) is required. Performance and payment bonds will be required from the successful offeror.

Submission & Evaluation

  • Proposal Due Date: February 27, 2026, at 14:00 PST.
  • Submission Method: Proposals must be submitted via email to christopher.whipple@va.gov and Cc: daniel.jhun@va.gov.
  • Evaluation Criteria: Award will be based on the lowest priced proposal that is responsive to the RFP.
  • Eligibility: Offerors must be registered in SAM.gov and certified as an eligible SDVOSB on the SBA Small Business Search website prior to evaluation and award.
  • Requests for Information (RFIs): The period for submitting RFIs has closed; no further questions will be accepted.

Key Documents & Requirements

Bidders must adhere to the following:

  • Wage Determination: Proposals must be based on the updated Wage Determination number NV20260038 01/30/2026.
  • Subcontracting Limitations: Compliance with VAAR 852.219-75 regarding subcontracting limits (85% for general construction, excluding materials) and submission of the required certification.
  • Pricing: Utilize the provided Price Breakdown template for detailed cost proposals.
  • Compliance: Adherence to VA PIV card access procedures, VHA Infection Control Risk Assessment (ICRA), and Pre-Construction Risk Assessment (PCRA) protocols.
  • Technical Details: Thorough review of the Statement of Work (SOW), Specifications (Vol 1 & 2), and Drawings is essential for understanding project requirements.

People

Points of Contact

Christopher WhippleContract SpecialistPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 7
Solicitation
Posted: Feb 27, 2026
View
Version 6Viewing
Solicitation
Posted: Feb 12, 2026
Version 5
Solicitation
Posted: Jan 23, 2026
View
Version 4
Solicitation
Posted: Jan 14, 2026
View
Version 3
Solicitation
Posted: Jan 14, 2026
View
Version 2
Pre-Solicitation
Posted: Nov 19, 2025
View
Version 1
Sources Sought
Posted: Oct 28, 2025
View