Z1DA--585-25-103 - Upgrade Facility Generator Controls Construction

SOL #: 36C25226B0003Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
252-NETWORK CONTRACT OFFICE 12 (36C252)
MILWAUKEE, WI, 53214, United States

Place of Performance

325 East H Street

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Maintenance Of Hospitals And Infirmaries (Z1DA)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Nov 17, 2025
2
Last Updated
Feb 23, 2026
3
Submission Deadline
Mar 2, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA) is soliciting bids for the Upgrade Facility Generator Controls Construction Project (585-25-103) at the Oscar G. Johnson VA Medical Center in Iron Mountain, MI. This Firm-Fixed-Price contract, estimated between $1M and $2M, involves modernizing the control systems for three Cummins 1250kW diesel generators. Offers are due March 17, 2026, at 1:00 PM CST.

Scope of Work

The project's objective is to upgrade the control system for three Cummins 1250kW diesel generators. Key tasks include:

  • Installation of modernized PCC3.3 Controllers at each generator.
  • Replacement of the legacy Digital Master Controller (DMC) with Cummins’ modern DMC 8000.
  • Installation of new control wiring to the MV switchgear.
  • Provision of a temporary 1000kW minimum 480V generator and a 480V/13.8kV step-up transformer to ensure continuous backup power during the upgrade.
  • Upgrade and programming of fifteen (15) communication cards in existing facility Automatic Transfer Switch (ATS) units for compatibility with DMC8000 V3.3 software.
  • Furnishing all necessary labor, materials, tools, equipment, and ensuring compliance with federal labor standards, including prevailing wage rates for Dickinson County, MI.

Contract Details

  • Type: Firm-Fixed-Price
  • Magnitude: $1,000,000.00 - $2,000,000.00
  • NAICS Code: 238210 (Electrical Contractors and Other Wiring Installation Contractors) with a $19 million size standard.
  • Set-Aside: Full and Open Competition
  • Performance Period: 430 calendar days from Notice to Proceed (NTP). This includes 90 days for submittals (Phase 0) and 340 days for equipment lead time, demolition, and construction (Phase 1). Work is to be performed between October and April.

Submission & Evaluation

  • Offers Due: March 17, 2026, 1:00 PM CST.
  • Bid Opening: March 17, 2026, 1:00 PM CST, at the Great Lakes Acquisition Center (GLAC) in Milwaukee, WI.
  • Questions Due: February 20, 2026, 3:00 PM local time, submitted to Donita Grace.
  • Site Visit: A site visit is scheduled for February 12, 2026, at 10:00 AM CST at the Oscar G Johnson VAMC. Bidders are instructed to visit the site to verify existing conditions.
  • Requirements: Bidders must acknowledge VAAR 852.219-75 (Limitations on Subcontracting), provide a bid guarantee (20% of bid price, not exceeding $200,000), and secure Performance and Payment Bonds upon award. Award will be made to the responsible bidder submitting the lowest responsive bid.

Additional Notes

A Justification and Approval (J&A) document indicates the need for proprietary Cummins brand name generator controls due to compatibility with existing equipment, making a full generator replacement cost-prohibitive. Bidders are responsible for monitoring SAM.gov for any amendments.

People

Points of Contact

Donita L GraceContractorPRIMARY

Files

Files

Download
Download
Download
Download

Versions

Version 11
Solicitation
Posted: Feb 23, 2026
View
Version 10
Solicitation
Posted: Feb 19, 2026
View
Version 9
Solicitation
Posted: Feb 18, 2026
View
Version 8
Solicitation
Posted: Feb 18, 2026
View
Version 7
Solicitation
Posted: Feb 6, 2026
View
Version 6Viewing
Solicitation
Posted: Feb 6, 2026
Version 5
Pre-Solicitation
Posted: Jan 21, 2026
View
Version 4
Sources Sought
Posted: Dec 12, 2025
View
Version 3
Sources Sought
Posted: Dec 12, 2025
View
Version 2
Sources Sought
Posted: Dec 3, 2025
View
Version 1
Sources Sought
Posted: Nov 17, 2025
View
Z1DA--585-25-103 - Upgrade Facility Generator Controls Construction | GovScope