Z1DA--585-25-103 - Upgrade Facility Generator Controls Construction

SOL #: 36C25226B0003Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
252-NETWORK CONTRACT OFFICE 12 (36C252)
MILWAUKEE, WI, 53214, United States

Place of Performance

Iron Mountain, MI

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Maintenance Of Hospitals And Infirmaries (Z1DA)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Nov 17, 2025
2
Last Updated
Feb 23, 2026
3
Submission Deadline
Mar 26, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA), Network Contract Office 12, is soliciting bids for the Upgrade Facility Generator Controls Construction project (Project # 585-25-103) at the Oscar G. Johnson VA Medical Center in Iron Mountain, MI. This project, set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), involves upgrading the control systems for three Cummins 1250kW diesel generators. Proposals are due March 26, 2026, at 1:00 PM CST.

Scope of Work

The project requires the upgrade of control systems for three existing Cummins 1250kW diesel generators. Key tasks include:

  • Installation of modernized PCC3.3 Controllers and Cummins DMC 8000.
  • Replacement of legacy Digital Master Controller (DMC) with Cummins’ modern DMC 8000.
  • Installation of new control wiring to the MV switchgear.
  • Provision of a temporary 1000kW generator and 480V/13.8kV step-up transformer to maintain backup power during the upgrade.
  • Upgrade and programming of fifteen communication cards in existing facility Automatic Transfer Switch (ATS) units.
  • Furnishing all necessary labor, materials, tools, equipment, transportation, licenses, certificates, insurance, and temporary protection.
  • Compliance with NFPA 99 and 110 standards, and adherence to Buy American requirements.
  • The use of Cummins proprietary components and software is required, as justified by a J&A.

Contract Details & Timeline

  • Contract Type: Firm-Fixed-Price.
  • Estimated Magnitude: Between $1,000,000 and $2,000,000.
  • Period of Performance: 430 calendar days after receipt of Notice to Proceed (NTP).
  • Set-Aside: Service-Disabled Veteran-Owned Small Business (SDVOSB).
  • Proposal Due Date: March 26, 2026, at 1:00 PM CST.
  • RFI Due Date: March 10, 2026, at 3:00 PM local CST.
  • Site Visit: A second pre-bid conference is scheduled for Wednesday, February 25, 2026, at 10:00 AM CST at the Oscar G Johnson VA Hospital.

Submission & Evaluation

Award will be made to the responsible bidder submitting the lowest responsive bid. Bidders must acknowledge all amendments on Page 2 of the SF-1442. A bid guarantee (not less than 20% of bid price, not to exceed $200,000) is required, along with Performance and Payment Bonds upon award. All questions should be sent to Donita Grace.

Additional Notes

Bidders are responsible for monitoring SAM.gov for any further amendments.

People

Points of Contact

Donita L GraceContractorPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 11
Solicitation
Posted: Feb 23, 2026
View
Version 10Viewing
Solicitation
Posted: Feb 19, 2026
Version 9
Solicitation
Posted: Feb 18, 2026
View
Version 8
Solicitation
Posted: Feb 18, 2026
View
Version 7
Solicitation
Posted: Feb 6, 2026
View
Version 6
Solicitation
Posted: Feb 6, 2026
View
Version 5
Pre-Solicitation
Posted: Jan 21, 2026
View
Version 4
Sources Sought
Posted: Dec 12, 2025
View
Version 3
Sources Sought
Posted: Dec 12, 2025
View
Version 2
Sources Sought
Posted: Dec 3, 2025
View
Version 1
Sources Sought
Posted: Nov 17, 2025
View