Z1NE--580-26-501 Repair Water Lines
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of Veterans Affairs (VA) has awarded a Firm Fixed-Price contract to SENTINEL SERVICES, LLC for the Repair of Water Lines at the Michael E. DeBakey VA Medical Center in Houston, Texas. The award, valued at $248,000.00, addresses an urgent need to repair underground water pipe leaks.
Scope of Work
The project involves repairing underground water pipe leaks near Building 125, Building 104A, and the Spinal Cord Parking Entrance. This includes 2", 6", and 8" PVC C900 water pipes. The scope encompasses:
- Excavation and demolition of existing concrete.
- Repair or replacement of damaged piping with materials equivalent to or better than existing.
- Installation of new concrete, including rebar and dowels, to match original specifications.
- Coordination with VA security and the Contracting Officer's Representative (COR).
- Work may require after-hours and weekend efforts due to urgency.
- A one-year warranty is required upon project acceptance.
Contract & Timeline
- Type: Firm Fixed-Price
- Value: $248,000.00
- Set-Aside: Service-Disabled Veteran-Owned Small Business (SDVOSB)
- Award Date: April 15, 2026
- Awardee: SENTINEL SERVICES, LLC (UEI: C1NZB7KDTEK3)
- Period of Performance: 30 calendar days after receipt of Notice to Proceed.
Evaluation
The contract was awarded following a solicitation (36C25626Q0549) that evaluated technical acceptability and price, with technical and past performance being equal factors.
Additional Notes
The repair was deemed urgent, with no extensions offered for the original proposal due date. Bidders were required to provide an estimated schedule, technical/management approach, and cost breakdown. Field verification of site conditions was necessary, despite provided drawings. The VA is responsible for local agency approvals.