Z2DA--549-21-700 EHRM Infrastructure Upgrades Construction Dallas VAMC
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of Veterans Affairs (VA), through its PCAC (36C776) office, is soliciting proposals for the EHRM Infrastructure Upgrades Construction project at the Dallas VA Medical Center, TX. This UNRESTRICTED solicitation seeks a contractor for a design-bid-build project to modernize IT and physical infrastructure, including the construction of a new stand-alone single-story building. The contract is a Firm-Fixed-Price award with an estimated value between $50,000,000 and $75,000,000. Proposals are due April 14, 2026, at 6:00 PM EST.
Scope of Work
The project encompasses comprehensive infrastructure upgrades to support the Electronic Health Record Modernization (EHRM) system. Key components include:
- Construction of a new stand-alone single-story building to support primary care and mental health services.
- Modernization of IT and physical infrastructure across 126 IT spaces (Telecommunication Rooms/Enclosures) in multiple buildings, including three at the Herzog Campus.
- Installation of redundant fiber optic cabling (ring topology and backbone), new dedicated electrical panels, rack-mounted Power Distribution Units (PDUs), and Uninterruptible Power Supply (UPS) units.
- Upgrades to HVAC systems, including new Variable Refrigerant Flow (VRF) DX cooling-only systems, and integration with the existing Siemens Building Management System.
- Implementation of Physical Access Control Systems (PACS), Intrusion Detection Systems (IDS), and Security Surveillance Television Systems (SSTV) using specified manufacturers (Avigilon, Hirsch Identiv).
- Extensive demolition of existing electrical, lighting, power devices, mechanical equipment, and abandoned telecommunication infrastructure.
- Hazardous material abatement, specifically for identified asbestos and lead-based paint.
- Compliance with all VA specifications, drawings, regulations, and applicable codes.
- The project will be executed in phases to minimize disruption to ongoing healthcare services, potentially requiring off-hours work.
Contract Details & Timeline
- Contract Type: Firm-Fixed-Price (FFP)
- Estimated Value: $50,000,000 - $75,000,000
- Period of Performance: 730 calendar days from Notice to Proceed (NTP), anticipated within 90 days post-award.
- Set-Aside: UNRESTRICTED
- NAICS Code: 236220 (Commercial and Institutional Building Construction), size standard $45.0 million.
- Proposal Due Date: April 14, 2026, 6:00 PM EST
- Published Date: April 10, 2026
Submission & Evaluation
Proposals must be submitted in three volumes (Technical, Price, Administrative) as searchable PDFs (each under 5MB) via email to Shawn.Tavernia@va.gov (cc: bridget.may@va.gov). A Bid Guarantee (SF 24) of at least 20% of the proposal price (not exceeding $3,000,000) is required. Payment and Performance Bonds (SF 25A and SF 25) will be required upon award.
Evaluation will follow a Best Value tradeoff process, with Past Performance being the most important factor, followed by SDVOSB/VOSB Commitment, and Price. Offerors must acknowledge all amendments and provide a response to FAR 52.203-2. A 10% price evaluation factor will be added to large business proposals only if a HUBZone small business submits an offer and does not waive the preference.
Key Clarifications
- Design team members involved in construction documents are precluded from participating as Prime, Mentor-Protégé, or subcontractor.
- Offerors are responsible for all state and local sales/use taxes.
- All personnel require a VA PIV Card, initiated post-bond submission.
- A 3rd party scheduler is required.
- Field verification of existing conditions and cable counts is mandatory.