36C25726R0032_2 674A4-22-254 - CON CTX Consolidate Engineering Bldg. 17

SOL #: 36C25726R0032Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
257-NETWORK CONTRACT OFFICE 17 (36C257)
San Antonio, TX, 78240, United States

Place of Performance

Place of performance not available

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Hospitals And Infirmaries (Y1DA)

Set Aside

No set aside specified

Timeline

1
Posted
Nov 13, 2025
2
Last Updated
Jan 30, 2026
3
Submission Deadline
Jan 27, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA), Network Contracting Office 17, has issued Solicitation 36C25726R0032 for the Consolidated Engineering Building 17 project at the Doris Miller VA Medical Center in Waco, TX. This 100% Service-Disabled Veteran Owned Small Business (SDVOSB) set-aside opportunity involves the reconfiguration and renovation of an old laundry facility into offices and shops for engineering staff. Proposals are due by January 30, 2026, at 10:00 AM CST.

Scope of Work

This project requires a General Contractor to provide all labor, supervision, materials, and equipment to convert Building 17 into modern offices and shops. Key tasks include reconfiguring electrical, mechanical, plumbing, and IT systems according to the Statement of Work, drawings, and specifications. Work may necessitate after-hours and weekend performance with prior approval. Compliance with all applicable city, county, state, federal regulations, OSHA standards, and Infection Control Risk Assessment (ICRA) is mandatory. A dedicated Superintendent, who cannot be subcontracted, must be present at all times work is performed. An Asbestos Reinspection Report (2009) indicates chrysotile asbestos in the "Flooring Mastic" on the First Floor, which bidders must consider.

Contract Details

This is a Firm-Fixed-Price contract with an estimated magnitude between $5,000,000 and $10,000,000. The Period of Performance is 365 calendar days after the Notice to Proceed. The applicable NAICS code is 236220 (Commercial and Institutional Building Construction) with a $45M size standard. This is a 100% SDVOSB set-aside, requiring offerors to be SBA certified and registered in SAM.gov. Performance and Payment bonds are required. Amendment 0004 clarifies that all alternates are to be included in the base price.

Submission & Evaluation

Proposals are due by January 30, 2026, at 10:00 AM CST, and must be submitted via email to stephanie.ingersoll@va.gov and Rhonda.richardson5@va.gov. Submissions must include four volumes: Technical Acceptability (max 5 pages), Past Performance (max 40 pages), Price/Cost, and Solicitation, Offer, & Award Documents. Amendment 0005 updates the self-performed calculations required for the "Limitations on Subcontracting" clause (VAAR 852.219-75), which offerors must complete. Evaluation will be based on Technical Acceptability, Past Performance (significantly more important than price), and Price, aiming for the best value to the Government.

Key Documents & Notes

Responses to Requests for Information (RFI) provided clarifications on communication/access security drawings, confirmed the Site Superintendent and QC roles can be combined, and approved specific material uses. An Itemized Cost Breakdown worksheet (Attachment 4) is provided for detailed pricing.

People

Points of Contact

Rhonda RichardsonSenior Contract SpecialistPRIMARY
Stephanie IngersollSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 8
Solicitation
Posted: Jan 30, 2026
View
Version 7
Solicitation
Posted: Jan 27, 2026
View
Version 6
Solicitation
Posted: Jan 26, 2026
View
Version 5
Solicitation
Posted: Jan 21, 2026
View
Version 4Viewing
Solicitation
Posted: Dec 31, 2025
Version 3
Solicitation
Posted: Dec 23, 2025
View
Version 2
Solicitation
Posted: Dec 23, 2025
View
Version 1
Pre-Solicitation
Posted: Nov 13, 2025
View