Z2DA--NRM| 646-20-109 UD Chiller Capacity and Controls Upgrade (VA-26-00044970) (VA-26-00044970)
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of Veterans Affairs (VA), specifically the Network Contract Office 4, has issued a Solicitation for the UD Chiller Capacity and Controls Upgrade project (Project No. 646-20-109) at the Pittsburgh VA Medical Center - University Drive. This is a Firm-Fixed-Price construction contract with an estimated magnitude of over $15,000,000. The project involves comprehensive demolition, general construction, alterations, mechanical, and electrical work to upgrade the chiller plant. Proposals are due June 12, 2026, at 3:30 PM EST.
Scope of Work
The contractor will furnish all labor, materials, equipment, tools, transportation, permits, and supervision for the chiller capacity and controls upgrade. Key aspects include:
- Demolition and Construction: Extensive demolition of existing systems and new construction across architectural, structural, plumbing, mechanical, and electrical disciplines.
- HVAC Systems: Installation of new chillers and cooling towers, including specific brand-name components like Trane Centrifugal Chillers and Baltimore Aircoil Company cooling towers to integrate with existing infrastructure.
- Electrical Systems: Upgrades to electrical infrastructure, including switchgear, transformers, distribution panels, and lighting.
- Plumbing Systems: Installation of new plumbing, including schedule 20 SS for condenser water piping.
- Phased Approach: The project will follow a detailed phasing plan, including temporary chillers and coordinated shutdowns to minimize impact on patient care.
- Compliance: Adherence to detailed specifications (Volumes I & II), drawings, wage determinations (PA20260001), safety, and infection control programs.
Contract Details
- Contract Type: Firm-Fixed-Price
- Period of Performance: 540 calendar days from Notice to Proceed (NTP).
- Liquidated Damages: $606.00 per day.
- Set-Aside: Unrestricted (Full and Open Competition).
- Bonds: An Offer Guarantee (SF 24) of not less than 20% of the offer price (not to exceed $3,000,000) is required. Performance Bond (SF 25) and Payment Bond (SF 25A) will be required upon award.
Submission & Evaluation
- Proposal Due Date: June 12, 2026, 3:30 PM EST.
- RFI Due Date: May 12, 2026, 3:30 PM EST.
- Submission Format: Electronic submission of two separate PDF files: Volume I (Technical) and Volume II (Price).
- Evaluation: Best Value Tradeoff, with Technical Ability (Experience, Capability, Quality Control) and Past Performance being significantly more important than Price.
- Required Forms: Bidders must complete Exhibit A (Statement of Prior Experience), Exhibit B (Subcontractor Information and Consent Form), and be aware of Exhibit C (Past Performance Questionnaire) and Exhibit D (Sample Transmittal Letter for PPEQ) for reference checks.
- Registration: All respondents must be registered in SAM.gov.
Additional Notes
A pre-proposal site visit was held on April 14, 2026. Detailed drawings (architectural, structural, mechanical, electrical, plumbing, general phasing) and RFI responses providing critical clarifications are available. Contact Amy L Demarest at amy.demarest@va.gov for inquiries.