ZDV CTRB Raised Floor

SOL #: 6973GH-26-R-00024Solicitation

Overview

Buyer

Transportation
Federal Aviation Administration
6973GH FRANCHISE ACQUISITION SVCS
OKLAHOMA CITY, OK, 73125, United States

Place of Performance

Longmont, CO

NAICS

Flooring Contractors (238330)

PSC

Construction Of Miscellaneous Buildings (Y1JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Dec 1, 2025
2
Last Updated
Jan 23, 2026
3
Submission Deadline
Jan 28, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Aviation Administration (FAA) is soliciting proposals for the ZDV CTRB Raised Floor project in Longmont, CO. This Total Small Business Set-Aside involves the installation of a new 18-inch high raised access floor system and Signal Reference Grid (SRG) in the Control Wing Basement at the Denver ARTCC. The project is estimated to be between $250,000 and $500,000. Proposals are due January 28, 2026.

Scope of Work

The project's overall scope is to provide a new 18" high raised access floor system (approximately 2,982 SF) and SRG in the Control Wing Basement (B120A) at ZDV ARTCC. This includes:

  • Construction of two new ADA compliant ramps and stairs.
  • A new 9'-6" partition to enclose the new raised access floor system.
  • Removal of an existing non-conforming east door and installation of a new door within a new 2-hour rated alcove.
  • Selective demolition of existing ramps, stairs, electrical components, and portions of a partition.
  • Installation of wall and floor mounted handrails, fire stopping, and various finishes including static dissipative rubber and carpet tiles.
  • Relocation and installation of electrical components, communications grounding, and electronic safety/security systems.
  • Clarifications from Q&A: Asbestos removal must be included in the bid, with demolished doors assumed to contain asbestos. Existing worn door hardware for the double door entry must be replaced, and existing wall damage repaired. Underfloor dividers (Spec 09 69 00 3.3.1) are not required. The required concentrated load rating for the raised access floor is 1,250 lbs.

Contract Details

  • Contract Type: Solicitation (Firm Fixed-Price anticipated)
  • Estimated Value: $250,000.00 - $500,000.00
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Performance Period: 5 calendar days to begin performance, 30 calendar days to complete after Notice to Proceed (NTP).
  • Bonds: Performance Bond (SF 25) and Payment Bond (SF 25A) are required upon award.

Submission & Evaluation

  • Proposals Due: January 28, 2026, by 4:00 PM CST.
  • Submission Method: Email proposals to jason.m.perry@faa.gov.
  • Questions Due: January 14, 2026, by 4:00 PM CST.
  • Site Visit: January 7, 2026, at 09:30 AM MST. RSVP required by January 5, 2026, to sean.sorensen@faa.gov.
  • Evaluation: Award will be made to the lowest priced responsible offeror.
  • Required Forms: Offerors must complete the "Project Offeror Experience Information" form (16 Att 10) to demonstrate relevant experience.

Key Considerations

  • Environmental: Asbestos-Containing Materials (ACM) and Lead-Based Paint (LBP) have been identified in the project area (Room B120). Bidders must account for abatement strategies, safety protocols, and disposal in their proposals.
  • Labor: Compliance with the provided Wage Determination for Boulder County, CO, is mandatory for all laborers and mechanics.
  • Coordination: Extensive coordination with the COR and FAA personnel is required due to the facility being a 24-hour operation. Contractor personnel must be escorted by FAA representatives at all times.

People

Points of Contact

Jason PerryPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Solicitation
Posted: Jan 23, 2026
Version 1
Solicitation
Posted: Dec 1, 2025
View
ZDV CTRB Raised Floor | GovScope