12905B25R0002 Amendment 0005 - Solicitation for Water Well Repair USDA-ARS-PWA Dubois ID

SOL #: 12905B25R0002Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Agricultural Research Service
USDA ARS AFM APD
BELTSVILLE, MD, 20705, United States

Place of Performance

Dubois, ID

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Construction Of Water Supply Facilities (Y1NE)

Set Aside

No set aside specified

Timeline

1
Posted
May 14, 2025
2
Last Updated
Feb 26, 2026
3
Submission Deadline
Jan 31, 2026, 12:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The United States Department of Agriculture (USDA), Agricultural Research Service (ARS) is soliciting proposals for Water Well Repair at the RSPERC 19 Office Loop in Dubois, ID. This construction requirement involves drilling a new shaft and comprehensive well system upgrades. The latest amendment, Amendment 0005, extends the proposal submission deadline to January 30, 2026.

Scope of Work

The project requires the contractor to provide all labor, equipment, materials, supplies, transportation, and supervision for the repair of the water well. Key tasks include:

  • Drilling a new shaft to provide an additional potable water source.
  • Upgrading and adding piping in the wellhouse.
  • Replacing the chlorination system and installing a new telemetry system.
  • Providing temporary potable water storage if the system is offline for more than 24 hours.
  • Disinfection, testing, and pressure testing of temporary and permanent facilities.
  • Ensuring all connections and appurtenances provide a functioning well and potable water system.
  • Alternates: Decommissioning and capping the existing well, installing a new valve vault, and water storage tank upgrades.

Contract Details

  • Contract Type: Firm Fixed Price
  • Magnitude: Between $1,000,000.00 and $5,000,000.00
  • Period of Performance: 365 days from the Notice to Proceed (estimated 07/01/2025 to 06/30/2026).
  • Set-Aside: Unrestricted
  • NAICS Code: 237110 (Construction Of Water Supply Facilities)
  • Small Business Size Standard: $45 Million

Submission & Evaluation

  • Proposal Due Date: January 30, 2026, by 5:00 p.m. Mountain Time.
  • Submission Method: Proposals must be in writing, follow Section L guidelines, and be emailed to theodore.blume@usda.gov. The email subject must reference solicitation number 12905B25R0002.
  • Evaluation Criteria: Lowest Price Technically Acceptable (LPTA).
  • Bond Requirements: Bid Bond Guarantees are required for proposals above $150,000. Performance and Payment bonds will be required after award if thresholds are met (Payment > $35K, Performance > $150K), due ten days after award.

Key Amendments

  • Amendment 0005 (Latest): Extended the proposal deadline to January 30, 2026, due to a Federal Government shutdown, and indicated potential modifications to drawings/specifications.

Additional Notes

A site visit was conducted on May 28, 2025. All questions were due by June 12, 2025. This is the only official location for obtaining documents and updates. Offerors are responsible for monitoring the site for amendments.

People

Points of Contact

Joshua KeadleSECONDARY
Theodore BlumePRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 10
Combined Synopsis/Solicitation
Posted: Feb 26, 2026
View
Version 9
Combined Synopsis/Solicitation
Posted: Jan 29, 2026
View
Version 8Viewing
Combined Synopsis/Solicitation
Posted: Nov 5, 2025
Version 7
Combined Synopsis/Solicitation
Posted: Aug 21, 2025
View
Version 6
Combined Synopsis/Solicitation
Posted: Jul 15, 2025
View
Version 5
Combined Synopsis/Solicitation
Posted: Jun 23, 2025
View
Version 4
Combined Synopsis/Solicitation
Posted: May 28, 2025
View
Version 3
Combined Synopsis/Solicitation
Posted: May 28, 2025
View
Version 2
Combined Synopsis/Solicitation
Posted: May 21, 2025
View
Version 1
Combined Synopsis/Solicitation
Posted: May 14, 2025
View