137th SOW Bldg. 1047 Infrastructure for washer and dryer installation
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army, W7NV USPFO ACTIVITY OKANG 137, is soliciting proposals for the installation of infrastructure for washer and dryer operations in Building 1047 at the 137th Special Operations Wing in Oklahoma City, OK. This is a Total Small Business Set-Aside for a Firm Fixed Price (FFP) contract. Proposals are due by April 13, 2026, at 10:00 AM CST.
Scope of Work
This opportunity requires the installation of new commercial-grade washer and dryer units, along with necessary infrastructure upgrades. Key requirements include:
- Demolition of approximately 25 sq ft of concrete, followed by the installation of dowels and rebar, and placement of new concrete (minimum 4000 psi).
- Installation of new vent pipe and dryer vent cover, utilizing 8" galvanized spiral ductwork (no power vent required).
- Installation of new 208V power feed and disconnects, including furnishing and installing a 120/208V 80A single phase, 2 pole breaker, and an additional 15-amp circuit for the washer. Contractors must determine conductor size and conduit type per NEC requirements.
- Installation of new water lines; while specifications call for 3/4" hot and cold water, 1/2" pipes are present, and the men's bathroom (approx. 50 ft away) may be utilized for water supply.
- A sewer vent is required for the washer drain connection, and PVC piping is acceptable for the discharge drain line, which will be a direct tie-in.
- Development and maintenance of an effective Quality Control Plan (QCP).
- Compliance with all installation/facility access and local security policies.
- Unit clearance should refer to manufacturer recommendations when setting the unit 36" from the back wall; the unit is electric, with no gas.
Contract & Timeline
- Contract Type: Firm Fixed Price (FFP)
- Period of Performance: 60 calendar days, to be completed within 60 days after Notice to Proceed.
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- Proposal Due Date: April 13, 2026, at 10:00 AM CST
- Published Date: March 30, 2026 (latest amendment publication)
- A Bid Bond (SF24 form) is required with proposal submission.
- Construction Wage Rate Requirements (Davis Bacon) are applicable, and bidders must refer to the provided Wage Determination document for Oklahoma County.
Submission & Evaluation
Proposals must be submitted electronically and will be evaluated based on "best value." Offerors must be registered in the System for Award Management (SAM) and acknowledge all amendments to the solicitation. Proposals must remain valid for at least 30 calendar days after the due date. Site visits were previously allowed by appointment, and a sign-in sheet from the March 11, 2026 visit has been posted.
Additional Notes
Detailed architectural and engineering drawings (Attachment 2) are available, providing critical information for layout, plumbing, mechanical, electrical, demolition, and rebar. Multiple Q&A documents have clarified specific technical requirements regarding electrical, plumbing, and venting systems.