24K Environmental Control Unit (ECU) Sole Source to Raytheon

SOL #: SPRRA2-26-R-0034SolicitationSole Source

Overview

Buyer

DEPT OF DEFENSE
Defense Logistics Agency
HQ DEFENSE LOGISTICS AGENCY
FORT BELVOIR, VA, 22060, United States

Place of Performance

Andover, MA

NAICS

Guided Missile and Space Vehicle Manufacturing (336414)

PSC

Miscellaneous Items (9999)

Set Aside

No set aside specified

Timeline

1
Posted
Dec 5, 2025
2
Last Updated
Jun 4, 2026
3
Submission Deadline
Jul 31, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Defense Logistics Agency (DLA) has issued RFP SPRRA2-26-R-0034 for pricing of 24K Environmental Control Units (ECU) and ADI TPX-57A(V)1 Update – Radar Mod Kits to support Patriot Ground Support Equipment (GSE). This is a sole source requirement to Raytheon. The opportunity has undergone multiple amendments, extending ordering periods and modifying parts lists and proposal submission requirements. Proposals are due by April 30, 2026, at 4:00 PM CST.

Scope of Work

This Request for Proposal (RFP) seeks Firm-Fixed-Price proposals for specific part numbers related to:

  • 24K Environmental Control Units (ECU): Used to support Patriot GSE. The initial quantity for Line Item 1 (Green ECU) was revised from 75 to 45 units. The minimum quantity for the 24K ECU under the extended ordering period is 10 units.
  • ADI TPX-57A(V)1 Update – Radar Mod Kits: The minimum quantity for this item has been increased from 10 to 50 units for the five-year duration. The requirement involves providing spare parts for the Patriot system, with estimated quantities for Fiscal Years 2026 through 2030.

Contract & Timeline

  • Type: Solicitation (RFP), contemplating a Firm-Fixed-Price contract.
  • Duration: Ordering periods for the ECU and Radar Mod Kit have been extended from a two-year (FY26-FY27) to a five-year pricing catalog (FY26-FY30).
  • Set-Aside: None specified. The opportunity title indicates "Sole Source to Raytheon."
  • Place of Performance: Andover, MA, United States.
  • Proposal Due: April 30, 2026, at 4:00 PM CST.
  • Published: June 4, 2026 (Initial publication date).

Key Amendments & Changes

  • Amendment 001 (Jan 8, 2026): Extended the proposal due date from January 29, 2026, to April 30, 2026. Revised the quantity for Line Item 1 (P/N 2714M1000-90, Green ECU) from 75 to 45 units.
  • Amendment 002 (Feb 13, 2026): Added additional parts to the RFP and provided an updated parts list for Patriot Spares.
  • Amendment 003 (Mar 5, 2026):
    • Extended ordering periods for the 24K ECU and Radar Mod Kit to a five-year pricing catalog (FY26-FY30).
    • Adjusted minimum quantities: Radar Mod Kit increased from 10 to 50 units; 24K ECU minimum remains 10 units for the five-year duration.
    • Modified the parts list, removing HVPS and Digital Encoder, and specifically including the Radar Mod Kit and 24K ECU.
    • Revised proposal structure, requiring separate proposals for the ADI TPX-57A(V)1 Update – Radar Mod Kit and the 24K ECU under the same RFP.

Submission Requirements

Proposals must include a summary schedule with fully supportable cost data, including labor categories, hours, material/equipment costs, and total cost breakdown. Supporting documentation for subcontractors, an un-sanitized Excel cost breakdown, and indirect expense rates are required. Bidders must identify any Organizational Conflicts of Interests (OCIs) and comply with FAR 52.204-24 and DFARS 252.204-7016. The two main items (Radar Mod Kit and 24K ECU) require separate proposals.

People

Points of Contact

Kimberly S. ThomasPRIMARY
Anna PhillipsSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 8Viewing
Solicitation
Posted: Jun 4, 2026
Version 7
Solicitation
Posted: Mar 4, 2026
View
Version 6
Solicitation
Posted: Feb 13, 2026
View
Version 5
Solicitation
Posted: Feb 13, 2026
View
Version 4
Solicitation
Posted: Jan 8, 2026
View
Version 3
Solicitation
Posted: Dec 29, 2025
View
Version 2
Pre-Solicitation
Posted: Dec 10, 2025
View
Version 1
Sources Sought
Posted: Dec 5, 2025
View
24K Environmental Control Unit (ECU) Sole Source to Raytheon | GovScope