355 CMS/MXMCE Receptacle and Installation Services

SOL #: FA487726QA024Sources Sought

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA4877 355 CONS PK
DAVIS MONTHAN AFB, AZ, 85707-3522, United States

Place of Performance

Tucson, AZ

NAICS

Noncurrent-Carrying Wiring Device Manufacturing (335932)

PSC

Electrical Hardware And Supplies (5975)

Set Aside

Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15) (WOSB)

Timeline

1
Posted
Feb 10, 2026
2
Last Updated
Feb 25, 2026
3
Response Deadline
Feb 17, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is conducting a Sources Sought for 355 CMS/MXMCE Receptacle and Installation Services at Davis-Monthan Air Force Base, AZ. This market research aims to identify qualified Women-Owned Small Businesses (WOSB) capable of providing and installing two specialized 60 Amp electrical receptacles. Responses will help the 355th Contracting Squadron determine industry capabilities for a potential future solicitation. Responses are due February 17, 2026, at 12:00 PM MST.

Purpose & Scope

This is a Sources Sought announcement for market research purposes only. The 355th Contracting Squadron seeks to identify interested and capable contractors for the commodity purchase and installation of two 115/230VAC, 4-wire, 3-phase, 60 Amp receptacles. These receptacles must be designed to mate with the purge unit plug CPH-6034BC. The scope includes:

  • Installation of two 115/230 VAC, 4-wire, 3-phase, 60-amp receptacles in Building 5045 at Davis-Monthan Air Force Base, AZ.
  • Receptacles must be wall-mounted, compatible with Purge Unit Plug, Cat No. CPH-6034BC, and rated for Hazardous Location Class I, Group C, with delayed-action contacts.
  • Removal and proper disposal of damaged or improper connectors.
  • Ensuring installation does not interfere with existing equipment.
  • Providing all necessary components for a complete and functional installation.
  • Performing functional testing upon completion.
  • Submitting shop drawings or specification sheets for receptacle compatibility and a schedule within 7 days of material receipt.

Required Product Specifications

The receptacles must meet the following salient characteristics:

  • Dimensions: 15.75 in x 7 in x 5.63 in
  • Electrical Requirement: 3P 4W Circuit - 115/230VAC At 60Hz
  • Temperature Range: Class I, Divisions 1 & 2, Groups C, D; Class I, Zones 1 & 2, Groups IIB, IIA
  • Features: Aluminum 60 Amp Receptacles With Feed-Thru Enclosures - 3W 4P Circuit - 115/230VAC At 60Hz - Hub Size 1-1/4 Inch.

Performance Requirements

  • Installation must adhere to manufacturer's specifications, industry standards, and business practices.
  • Work areas must be kept clean and safe.
  • No asbestos-containing materials are permitted.
  • Contractor employees must be certified, qualified, fluent in English, and comply with all base access, safety (OSHA), and security regulations (e.g., CUI, no weapons).
  • Project completion is expected within 7 days after receiving all materials/parts.

Contract & Timeline

  • Type: Sources Sought (Market Research)
  • Set-Aside: Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15)
  • NAICS: 335932 - Noncurrent Carrying Wiring Device Manufacturing
  • Response Due: February 17, 2026, at 12:00 PM Mountain Standard Time (MST)
  • Published: February 10, 2026

Submission & Contact

Interested and capable contractors should submit feedback responses electronically to Mr. Jeffrey Dreyer at jeffrey.dreyer@us.af.mil. Proprietary information should be clearly marked. This is not a commitment by the Government, and no payment will be made for information submitted.

People

Points of Contact

Cody DarabanSECONDARY

Files

Files

No files attached to this opportunity

Versions

Version 3
Solicitation
Posted: Feb 25, 2026
View
Version 2
Solicitation
Posted: Feb 18, 2026
View
Version 1Viewing
Sources Sought
Posted: Feb 10, 2026