4520--Project 549A-SL-506 Replace Heat Exchanger Bonham

SOL #: 36C25726R0058Combined Synopsis/Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
257-NETWORK CONTRACT OFFICE 17 (36C257)
San Antonio, TX, 78240, United States

Place of Performance

Bonham, TX

NAICS

Plumbing (238220)

PSC

Space And Water Heating Equipment (4520)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Jan 23, 2026
2
Last Updated
Apr 29, 2026
3
Submission Deadline
May 8, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA), specifically the 257-NETWORK CONTRACT OFFICE 17 (36C257), is soliciting proposals for Project 549A-SL-506: Replacement of Heat Exchangers at the Sam Rayburn Memorial Veterans Center in Bonham, Texas. This is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside opportunity. The project involves replacing eight heat exchangers across four buildings. Proposals are due by May 8, 2026, at 3:00 PM Central Time.

Scope of Work

The project requires contractors to furnish all materials and labor for the replacement of eight (8) heat exchangers in Buildings #1, #2, #24, and #29. Key tasks include:

  • Disconnecting existing steam supply, condensate, water in/out, and controls.
  • Demolishing, removing, and disposing of existing Armstrong heaters.
  • Providing and installing new heat exchangers, steam piping, valves, fittings, condensate piping, drain piping, and relief valve piping.
  • Running electrical connections to new Steam Control Valves.
  • All work must comply with specifications, drawings, and applicable local and VA building codes.
  • Temporary hot water systems are required for all four buildings (1, 2, 24, and 29) during the replacement process and must be provided by the contractor. Performance requirements for mobile heat exchangers are 38 GPM for buildings 1, 2, and 29, and 75 GPM for building 24. Temporary fencing will be required around staging areas.
  • New PRV assemblies are required; existing ones are not to be reused.

Contract Details

  • Contract Type: Firm-Fixed-Price.
  • Period of Performance: 180 days after issuance of notice to proceed.
  • Estimated Value: $500,000.00 - $1,000,000.00.
  • Set-Aside: 100% Service-Disabled Veteran-Owned Small Business (SDVOSB).
  • NAICS Code: 238220 (Plumbing, Heating, and Air-Conditioning), with a small business size standard of $19M.
  • Product Service Code: 4520 (Space And Water Heating Equipment).
  • Offerors must demonstrate the ability to obtain bonding.
  • Texas Sales and Use Tax exemption applies to materials incorporated into VA real estate; proposals should exclude these taxes.

Submission & Evaluation

Proposals must be submitted via email to horacio.fernandez@va.gov. Submissions should be organized into four volumes:

  • Volume I: Technical Acceptability (EMR)
  • Volume II: Past Performance
  • Volume III: Price
  • Volume IV: Solicitation, Offer, & Award Documents Page limitations apply to each volume. Evaluation will prioritize Past Performance over Price.

Key Dates & Contacts

  • Proposal Due Date: May 8, 2026, at 3:00 PM Central Time.
  • Second Site Visit: April 28, 2026, at 10:00 AM Central Time, at the Bonham VA Medical Center, Building 9 Conference Room. This visit is to verify conditions addressed in RFIs 13 and 36. Contact COR Felix Sanmiguel for the site visit.
  • General Contact: Jose Reveles, Contract Specialist, jose.reveles@va.gov, (254) 899-6042.

People

Points of Contact

Jose RevelesContract SpecialistPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 9
Combined Synopsis/Solicitation
Posted: Apr 29, 2026
View
Version 8
Combined Synopsis/Solicitation
Posted: Apr 23, 2026
View
Version 7Viewing
Combined Synopsis/Solicitation
Posted: Apr 15, 2026
Version 6
Combined Synopsis/Solicitation
Posted: Apr 14, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Apr 3, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Mar 27, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Mar 6, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Feb 23, 2026
View
Version 1
Pre-Solicitation
Posted: Jan 23, 2026
View