59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVSUP Weapon Systems Support Mech, is seeking proposals for the repair and modification of Circuit Card Assemblies. This is a Total Small Business Set-Aside opportunity. The solicitation requires a Repair Turnaround Time (RTAT) of 90 days and mandates Government Source Inspection (GSI). Proposals are due by April 10, 2026.
Scope of Work
This Request for Quote (RFQ) is for the repair of CIRCUIT CARD ASSEMB items. The work involves meeting operational and functional requirements as represented by specific Cage Code/Reference Numbers (e.g., 10001, 2910426). Repairs must adhere to the contractor's standard practices, manuals, directives, drawings, and technical orders. Marking of items shall be in accordance with MIL-STD-130, REV N. Packaging must comply with MIL-STD 2073.
Contract & Timeline
- Type: Solicitation (RFQ for repair, resulting in a bilateral award)
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- Response Due: April 10, 2026, 8:30 PM UTC
- Published: March 12, 2026
Key Requirements & Evaluation
Offerors must provide a quote amount and their proposed Repair Turnaround Time (RTAT). The Government requires an RTAT of 90 days. If an offeror cannot meet this, they must provide capacity constraints. Government Source Inspection (GSI) is required. Only authorized distributors of the original manufacturer's item will be considered for award; proof on company letterhead is required with the offer. A price reduction will be incurred for failure to meet the required RTAT, with the contractor proposing the per-unit/per-month reduction amount and maximum. For items determined Beyond Repair (BR/BER), a Teardown & Evaluation fee/price should be included, with a negotiated reduced contract price if applicable. Contractors are responsible for all inspection requirements and must maintain records for 365 days post-delivery.
Additional Notes
All freight is FOB Origin. Freight handling is managed by the Navy as per the Commercial Asset Visibility (CAV) Statement of Work. Offerors should verify nomenclature, part number, and NSN prior to responding. Information on obtaining applicable document references (e.g., DODSSP, quicksearch.dla.mil) is provided.