91 OG Modular Walls
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force, 5 CONS is seeking proposals for the construction and installation of three modular walls for the 91st OSS/CC at Minot AFB, ND. This acquisition is a Combined Synopsis/Solicitation (RFQ), designated as a 100% Total Small Business Set-Aside. The modular walls must feature a universal framework for adaptability in elevation, dimension, fascia, and finish. Quotes are due by January 15, 2026, at 11:00 AM CDT.
Scope of Work
This requirement involves the construction and installation of new modular walls within the 91 OSS/CC section at 695 Minuteman Dr, Minot AFB, ND 58705. Key specifications include:
- Universal Framework: Must allow for changes in elevation, dimension, fascia function, and finish to maximize product life.
- Design: Demountable fascia and accessories for easy reconfiguration. Top 1/3 clear glass (6mm single framed) and bottom 2/3 fabric-wrapped acoustic panels.
- Acoustics: Up to 46 STC for glass, up to 48 STC for solid panels, and up to 85 NRC.
- Materials & Finishes: Horizontal grain fabric (gray), silver metal finishes, ombre frosted glass, aluminum frames.
- Doors: Barn style doors, ADA compliant, with frosted glass and vertical, rounded extra tall, silver handles. Wall 1 will have two doors, Wall 3 will have one, and Wall 2 will have none.
- Integration: Walls must integrate into existing drywall and ceiling panels without gaps, and be flush to the ground.
- Dimensions: Wall 1 (28ft 8in x 10ft high), Wall 2 (15ft 8in x 10ft high), Wall 3 (11ft 2in x 10ft high). Variations require prior coordination.
Period & Place of Performance
- Location: 91 OSS/CC, 695 Minuteman Dr, Minot AFB, ND 58705.
- Duration: Completion required within 120 days from contract award, including installation and removal of existing systems.
- Work Hours: Monday-Thursday, 0700-1600, excluding legal holidays and AFGSC down days.
Contract Details
- Type: Combined Synopsis/Solicitation (Request For Quotation - RFQ).
- Set-Aside: 100% Total Small Business Competition.
- NAICS Code: 332311 (Prefabricated And Portable Buildings).
- Small Business Size Standard: 750 employees.
- Funding: Contingent upon the availability of appropriated funds.
Submission & Evaluation
- Solicitation Issue Date: January 07, 2026.
- Site Visit: February 03, 2026, at 10:30 AM CST.
- Questions Deadline: February 04, 2026, at 4:00 PM.
- Quote Response Deadline: January 15, 2026, at 11:00 AM CDT.
- Submission Method: Quotes must be emailed to the listed POCs and Contracting Officer.
- Quote Validity: Quotes must be valid for 60 days.
- Format: Price quotations on the provided Quote Sheet; technical submissions on a separate document.
- Evaluation Criteria: Technical Capability (must meet specifications) and Price (evaluated comparatively).
Special Requirements
Vendors are responsible for verifying exact sizes, ensuring product dimensions comply, and confirming local codes. Substitutions or deviations must be itemized in writing. OSHA requirements must be met. Contractors may use government-furnished power, water, and restrooms. Base access requires entry through the South Gate and background checks for personnel (EAL). Daily cleanup is mandatory. Work may be impacted by base closures, weather, or mission necessities.
Contact Information
- Primary: Lt Jacob Trach (Jacob.Trach.1@us.af.mil, 701-723-4182)
- Secondary: Colton Snyder (colton.snyder@us.af.mil, 701-723-3056)