91 OG Modular Walls

SOL #: FA452826JT09Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA4528 5 CONS
MINOT AFB, ND, 58705, United States

Place of Performance

ND

NAICS

Prefabricated Metal Building and Component Manufacturing (332311)

PSC

Prefabricated And Portable Buildings (5410)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 13, 2026
2
Last Updated
Feb 23, 2026
3
Submission Deadline
Feb 28, 2026, 5:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force (91st OSS/CC, Minot AFB) is soliciting proposals for the construction and installation of three modular walls. This is a Total Small Business Set-Aside opportunity. The walls require a universal framework for adaptability in elevation, dimension, fascia, and finish. Quotes are due January 15, 2026, by 11:00 AM CDT.

Scope of Work

The project involves installing three modular walls at 695 Minuteman Dr, Minot AFB, ND 58705. Key specifications include:

  • Wall Dimensions: Wall 1 (28 ft 8 in x 10 ft high with two barn doors), Wall 2 (15 ft 8 in x 10 ft high with no doors), Wall 3 (11 ft 2 in x 10 ft high with one barn door).
  • Design: Universal framework, demountable fascia, top 1/3 clear glass (6mm single framed), bottom 2/3 fabric-wrapped acoustic panels.
  • Acoustics: Up to 46 STC for glass, 48 STC for solid panels, 85 NRC.
  • Materials: Horizontal grain fabric, silver metal finishes, ombre frosted glass, aluminum frames, ADA compliant barn style doors with specific handles.
  • Integration: Walls must integrate flush with existing drywall and ceiling panels, with no gaps.
  • Performance: Walls and doors must be fully functional, comply with local building codes, and meet OSHA requirements.

Contract Details

  • Opportunity Type: Combined Synopsis/Solicitation (RFQ)
  • Set-Aside: 100% Total Small Business Competition
  • NAICS Code: 332311 (Prefabricated And Portable Buildings)
  • Size Standard: 750 employees
  • Funding: Contingent upon availability of appropriated funds.
  • Place of Performance: 91 OSS/CC, 695 Minuteman Dr, Minot AFB, ND 58705.
  • Period of Performance: Completion within 120 days from contract award, including installation and removal of existing systems. Work hours are Monday-Thursday, 0700-1600.

Submission & Evaluation

  • Quote Deadline: January 15, 2026, 11:00 AM CDT.
  • Submission: Quotes via email to POCs and Contracting Officer. Price quotations must use the provided Quote Sheet; technical submissions must be separate.
  • Quote Validity: 60 days.
  • Evaluation Criteria: Technical Capability (meeting specifications) and Price (comparatively evaluated).
  • Questions Deadline: February 4, 2026, 4:00 PM.
  • Site Visit: February 3, 2026, 10:30 AM CST.

Special Requirements

Contractors must verify exact sizes, ensure product dimensions comply before manufacture, and verify local codes. Substitutions require written itemization and detailed drawings. Base access requires using the South Gate and submitting information for an Entry Authority Letter (EAL) for background checks. Daily cleanup is required. Work may be interrupted due to base operations or weather.

Contacts: Lt Jacob Trach (Jacob.Trach.1@us.af.mil, 7017234182) and Colton Snyder (colton.snyder@us.af.mil, 7017233056). Site POCs: Mrs. Gretta Holt (QA) and MSgt Anthony Touchette (SEL).

People

Points of Contact

Lt Jacob TrachPRIMARY
Colton SnyderSECONDARY

Files

Files

Download
Download
Download
Download
Download

Versions

Version 5
Combined Synopsis/Solicitation
Posted: Feb 23, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Feb 5, 2026
View
Version 3Viewing
Combined Synopsis/Solicitation
Posted: Feb 4, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Jan 23, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Jan 13, 2026
View
91 OG Modular Walls | GovScope