$99M SPK Mitigation and Vegetation Clearing MATOC
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Army Corps of Engineers (USACE), Sacramento District, is soliciting proposals for a $99M Multiple Award Task Order Contract (MATOC) for Mitigation and Vegetation Clearing Services. This Total Small Business Set-Aside opportunity aims to support Flood Risk Management (FRM) features and mitigation efforts within the Sacramento District's Area of Responsibility in California. Proposals are due February 20, 2026, at 14:00 PST.
Purpose & Scope
This MATOC will provide services including vegetation clearing, habitat development, elderberry transplanting and maintenance, re-vegetation for levee repair sites, creation and maintenance of offsite mitigation sites, native plant propagation, excavation, erosion control, well drilling, and invasive species management. The objective is to address mitigation and vegetation clearing requirements for civil works projects.
Contract Details
- Contract Type: Multiple Award Task Order Contract (MATOC)
- Total Contract Value: Up to $99,000,000 (maximum $50,000,000 per item or combination, minimum $2,000 total)
- Period of Performance: Task Orders may be issued for five years from the date of award.
- Set-Aside: Total Small Business Set-Aside (FAR 19.5) under NAICS 561730 (Size Standard $10,000,000).
- Place of Performance: USACE Sacramento District's Area of Responsibility in California.
Key Requirements & Evaluation
Proposals will be evaluated on a Pass/Fail basis for technical factors, with price evaluated at the task order level. Award will be made to responsible offerors with technically acceptable and most advantageous proposals.
Technical Factors (Pass/Fail):
- Previous Experience: Four projects demonstrating experience in Mitigation (min. $600K, 5 acres), Wetland/Riparian Restoration (min. $350K, 3 acres), Vegetation Clearing (min. $350K, 3 acres), and Elderberry Transplanting (min. $250K, 40 elderberries). Projects must be awarded within the last 6 years and at least 50% complete.
- Past Performance: Evaluated based on the four project types, potentially using CPARS.
- Key Personnel: Resumes required for Program Manager, Contractor Quality Control Supervisor (CQCS), and Native Plant Specialist, meeting specific qualifications.
Submission Details:
- Method: Electronic via the Procurement Integrated Enterprise Environment (PIEE) website in Adobe PDF format with OCR.
- Page Limits: Volume I (Technical Proposal and Past Performance) is limited to 30 pages.
Task Order Process
Individual task orders will be competed among MATOC holders, providing fair opportunity for orders exceeding $2,500. RFPs will specify scope, location, technical requirements, and performance period. Proposals will be firm-fixed-price and may require an itemized price breakout.
Important Dates
- Questions Due: No later than 10 calendar days prior to the synopsis closing date (via ProjNet Bidder Inquiry Portal: http://www.projnet.org/projnet, Bidder Inquiry Key: BHC92U-T22V4D).
- Proposal Submission Deadline: February 20, 2026, at 14:00 PST.
Contact Information
Primary Contact: Sean Summer (sean.a.summer@usace.army.mil, 916-557-7792).