AATTC Trailer Reconfiguration
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army, through the W7NJ USPFO ACTIVITY MOANG 139, is soliciting proposals for the AATTC Trailer Reconfiguration project at Rosecrans Memorial Airport, St. Joseph, MO. This project involves interior and exterior upgrades to South trailers and the decommissioning and removal of North trailers. This is a Total Small Business Set-Aside. Proposals are due January 30, 2026, at 10:00 AM Local Time.
Scope of Work
This project is divided into three phases:
- Phase 1: Interior Facility Upgrades (South Trailers) – Convert Room 109 into a SIPR café, install new SIPR ports and cabling, re-route power and NIPR LAN, and reconfigure door access. This includes demolition, painting, ceiling, flooring, and base trim work.
- Phase 2: Exterior Facility Upgrades (South Trailers) – Install a continuous exterior-rated vapor barrier, vertical metal paneling over existing skirting (on South, East, and West sides), insulate piping, test heat tape for sewer lines, relocate/install access panels, seal the building envelope, and install a new awning.
- Phase 3: Decommissioning and Removal (North Trailers) – Decommission and remove the North AATTC trailers (vendors are not required to remove them from base). This includes repairing existing decking, constructing new guardrails and stairs, and removing cameras, low-voltage wiring, skirting, and access panels. Salvage skirting boards for reuse.
Contract & Timeline
- Type: Firm Fixed Price (FFP)
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- Estimated Value: Between $25,000 and $100,000
- Period of Performance: Phase 1 NLT March 24, 2026; Phases 2 & 3 NLT April 28, 2026.
- Proposal Due: January 30, 2026, at 10:00 AM Local Time
- Published: January 29, 2026
Evaluation
Proposals will be evaluated based on technical risk and price, with the most advantageous offer representing the best value being selected.
Special Requirements & Notes
Offerors must acknowledge all amendments. Personnel requiring base access need REAL ID-compliant identification and must submit background check forms at least 7 working days prior. A Registered Communications Design and Distribution (RCDD) engineer is required for communications cabling. The contractor is responsible for providing a 30-yard dumpster for debris disposal off-base. Hazardous materials must be registered, and fire/digging permits are required.