Air Traffic Control Tower Rennovation

SOL #: FA470426R0012Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA4704 HQ AFSOUTH A4
DAVIS MONTHAN AFB, AZ, 85707-4257, United States

Place of Performance

Ceiba, PR

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Miscellaneous Buildings (Y1JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 3, 2026
2
Last Updated
Feb 16, 2026
3
Submission Deadline
Feb 20, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The United States Air Force is soliciting proposals for Air Traffic Control Tower (ATCT) Renovation services to perform critical safety repairs at Jose Aponte Airport, Ceiba, Puerto Rico. This is a 100% Total Small Business Set-Aside under NAICS code 236220. The project aims to improve operational safety and ensure compliance with applicable standards. Proposals are due by February 20, 2026, at 12:00 PM AST.

Scope of Work

The required construction services focus on safety repairs for the ATCT, which was recently reactivated. Key tasks include:

  • Window Replacement: Replace 8 existing ATCT cab windows with new glare-reducing, impact-resistant windows (ASTM E1886/E1996). Contractor must field verify dimensions and ensure weather-tight installation.
  • Fire Escape Ladder Replacement: Remove and replace three fire escape ladders (Cab to antenna, Cab to base operations roof, Base operations roof to ground). New ladders must meet OSHA, ANSI, and other safety codes, have a 300 lbs capacity, anti-slip treatment, and corrosion resistance.
  • Catwalk Railing Replacement: Remove and replace the existing railing around the ATCT cab catwalk with new painted steel railing meeting OSHA and IBC standards.

All work must adhere to UFC 4-133-01 and other codes, with a minimum 1-year warranty. The period of performance is 60 days from submittal approval and Notice to Proceed.

Contract Details

  • Contract Type: Firm Fixed-Price
  • Set-Aside: 100% Total Small Business
  • NAICS Code: 236220 (Construction Of Miscellaneous Buildings)
  • Place of Performance: Jose Aponte Airport, Ceiba, Puerto Rico
  • Period of Performance: 60 days from approval of submittals and Notice to Proceed.

Key Dates

  • Site Visit: Monday, February 9, 2026, at 10:00 AM AST at Jose Aponte Airport. (Refer to CVI Procedures Attachment for base access).
  • Questions Due: Tuesday, February 10, 2026, at 12:00 PM AST (via email to Primary POC).
  • Answers Provided: Wednesday, February 11, 2026, at 4:00 PM AST (posted as amendment).
  • Proposals Due: Friday, February 20, 2026, at 12:00 PM AST (electronically to Primary POC).

Submission Requirements

Proposals must be submitted in English and include:

  • Price Proposal: Detailed price breakdown.
  • Technical Proposal: Narrative demonstrating understanding and proposed approach to the SOW.
  • Past Performance: Information on three relevant projects completed in the last five years, including descriptions, contract numbers, dollar values, and points of contact.
  • Representations and Certifications: Completed forms.

Evaluation Factors

Award will be made to the responsible offeror whose proposal represents the best value to the Government, considering:

  • Price
  • Technical Capability
  • Past Performance

Special Considerations

Bidders should note the presence of Asbestos Containing Building Materials (ACBM) as detailed in the Asbestos Report, requiring careful management. Strict security and site access procedures are in place, including background checks, Airfield Driver Training, and radio communication requirements for airfield access. Prevailing wage rates for Puerto Rico apply, as outlined in the Wage Determination document.

People

Points of Contact

Jirah LackingsPRIMARY
Zachary FarelSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Solicitation
Posted: Feb 16, 2026
Version 3
Solicitation
Posted: Feb 12, 2026
View
Version 2
Solicitation
Posted: Feb 5, 2026
View
Version 1
Solicitation
Posted: Feb 3, 2026
View
Air Traffic Control Tower Rennovation | GovScope