B1510 NDI HVAC Repair

SOL #: FA480326B0002Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA4803 20 CONS LGCA
SHAW AFB, SC, 29152-5125, United States

Place of Performance

Charleston AFB, SC

NAICS

Plumbing (238220)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Refrigeration, Air Conditioning, And Air Circulating Equipment (J041)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Dec 16, 2025
2
Last Updated
Mar 6, 2026
3
Submission Deadline
Apr 15, 2026, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force, specifically the 20th Contracting Squadron, is soliciting bids for HVAC Repair at Building 1510, Shaw AFB, SC. This construction requirement involves the design, demolition, and installation of new HVAC equipment, including an air handling unit, hot water coils, and a boiler. This is a 100% Small Business Set-Aside under NAICS code 238220, with an estimated value between $250,000 and $500,000. Bids are due April 15, 2026.

Scope of Work

The project focuses on Building 1510 (4,400 sq ft) and involves replacing components of its 4-pipe HVAC system. The primary goal is to replace the existing air handling unit, hot water coils, and boiler. Key tasks include:

  • Demolition: Existing air handler unit, hot water coils, boiler, associated isolation valves, ductwork, and controls.
  • New Installation: Design and install a 25-ton air handling unit, new hot water coils, a gas-fired boiler, and a gas-fired water heater for domestic hot water.
  • System Upgrades: Install isolation valves, an air separator, a buffer tank, chilled/hot water piping, and rework ductwork.
  • Controls: Upgrade existing HVAC controls and connect to the base energy management system.
  • Testing: Conduct a test and balance upon completion, per UFGS 23 05 93.

Contract & Timeline

  • Opportunity Type: Solicitation (FA480326B0002)
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS: 238220
  • Magnitude: Between $250,000.00 and $500,000.00
  • Period of Performance: 90 Calendar Days after Notice to Proceed (amended by Solicitation Amendment FA480326B00020001).
  • Mandatory Site Visit: Tuesday, February 3, 2026, at 09:00 AM (local) EST at 575 Killian Avenue, Shaw AFB, SC 29152. Base access requests are due by Wednesday, January 28, 2026, to kishauna.goodman@us.af.mil and darrel.ford.3@us.af.mil.
  • Questions Due: Tuesday, February 10, 2026, by 2:00 P.M. (local) EST. Submit to kishauna.goodman@us.af.mil and darrel.ford.3@us.af.mil.
  • Bids Due: Wednesday, April 15, 2026, by 10:00 A.M. (local) EST. Electronic bids must be submitted through the Procurement Integrated Enterprise Environment (PIEE) system.
  • Bid Opening: Thursday, April 16, 2026, at 10:00 AM (local) EST at 20th Contracting Squadron, 321 Cullen Street, Building 216, 2nd Floor Conference Room 219. Virtual attendance via Microsoft Teams will also be available.
  • Published Date: March 6, 2026 (Amendment FA480326B00020001).

Special Requirements & Notes

  • Amendment: Solicitation Amendment FA480326B00020001 updates the SOW (dated Feb 20, 2026), removes the design phase requirement, reduces the Period of Performance to 90 days, and incorporates questions and answers. Offerors must acknowledge this amendment per Block 19 on Standard Form 1442.
  • Design Submittals: 35%, 65%, and 95% designs are required, along with as-builts upon project completion.
  • Equipment: New equipment must have a SEER rating of 14.
  • Working Conditions: The facility will be occupied during construction; work must accommodate occupants and minimize interference with base operations.
  • Supervision: A full-time contractor superintendent is required, who can also serve as SSHO. CQC and SSHO cannot be the same person.
  • Submission: Only electronic bids are accepted via PIEE. Email submission is permitted only after unsuccessful PIEE attempts and prior coordination with Mr. Ford or Ms. Goodman.

People

Points of Contact

KISHAUNA GOODMANPRIMARY
2Lt Mallory CarySECONDARY

Files

Files

View
View
View
View
Download

Versions

Version 5Viewing
Solicitation
Posted: Mar 6, 2026
Version 4
Solicitation
Posted: Jan 23, 2026
View
Version 3
Solicitation
Posted: Jan 23, 2026
View
Version 2
Pre-Solicitation
Posted: Dec 16, 2025
View
Version 1
Sources Sought
Posted: Dec 16, 2025
View
B1510 NDI HVAC Repair | GovScope